My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02242026 BPW Meeting Minutes - Final
sbend
>
Public
>
Public Works
>
Minutes
>
2026
>
02242026 BPW Meeting Minutes - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:27:05 PM
Creation date
3/10/2026 2:27:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
License Renewal
Document Date
3/10/2026
Text box
ID:
1
Creator:
Created:
3/10/2026 2:27 PM
Modified:
3/10/2026 2:27 PM
Text:
mailto:akrueger@milestonelp.com
ID:
2
Creator:
Created:
3/10/2026 2:27 PM
Modified:
3/10/2026 2:27 PM
Text:
mailto:dhilary@milestonelp.com
ID:
3
Creator:
Created:
3/10/2026 2:27 PM
Modified:
3/10/2026 2:27 PM
Text:
mailto:dsauer@reith-riley.com
ID:
4
Creator:
Created:
3/10/2026 2:27 PM
Modified:
3/10/2026 2:27 PM
Text:
mailto:estimatorindianaearth@yahoo.com
ID:
5
Creator:
Created:
3/10/2026 2:27 PM
Modified:
3/10/2026 2:27 PM
Text:
mailto:earth92inc@sbcglobal.net
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING FEBRUARY 24, 2026 24 <br /> <br /> <br />OPENING OF BIDS –MARION PEDESTRIAN BRIDGE – PROJECT NO. 123-060 (PR- <br />00045690) <br />This was the date set for receiving and opening sealed bids for the above referenced <br />project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune, <br />which was found to be sufficient. The following bids were opened and publicly read: <br /> <br />MILESTONE CONTRACTORS L.P. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />akrueger@milestonelp.com, dhilary@milestonelp.com <br /> Bid was signed by Mr. Dustin Hilary <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum(s) Acknowledgement received. <br /> <br /> BID: <br />Base Bid $2,900,897 <br />Alternate 1 $950,000 <br />Alternate 2 $1,065,000 <br /> <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />dsauer@reith-riley.com <br />Bid was submitted by Mr. Ruben Alvarado <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum(s) Acknowledgement received. <br /> <br /> BID: <br />Base Bid $3,893,370.50 <br />Alternate 1 $800,000 <br />Alternate 2 $930,000 <br /> <br /> <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the <br />above bids were referred to Engineering for review and recommendation. <br /> <br />TABLED - OPENING OF BIDS –SEITZ PARK RECONSTRUCTION PHASE 2 – PROJECT <br />NO. 125-041 (PR-00045293) <br />President Maradik noted that there was a request to table the above item. <br /> <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the <br />above opening was tabled till the March 10, 2026, meeting. <br /> <br />OPENING OF BIDS –COLFAX STREETSCAPE – PROJECT NO. 123-010 (PR-00045673) <br />This was the date set for receiving and opening sealed bids for the above referenced <br />project. The Clerk tendered proof of publication of the Notice in the South Bend Tribune, <br />which was found to be sufficient. The following Bids were opened and publicly read: <br /> <br />INDIANA EARTH, INC. <br />10343 McKinley Hwy. <br />Osceola, IN 46561 <br />estimatorindianaearth@yahoo.com; earth92inc@sbcglobal.net <br /> Bid was signed by Mr. Mark Osler <br /> Non-Collusion, Non-Discrimination Affidavit Form was completed. <br /> Five percent (5%) Bid Bond was submitted.
The URL can be used to link to this page
Your browser does not support the video tag.