My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-13 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2013
>
06-10-13 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2013 3:13:51 PM
Creation date
6/6/2013 11:18:20 AM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2"a Substitute Bill No. 18-13 <br /> Page 3 <br /> (2) Maps depicting wetlands <br /> (3) Maps depicting floodplains and compliance with Sections 6-38 and 6-39 <br /> of the South Bend Municipal Code <br /> (4) Maps depicting drainage basins/watersheds. <br /> (d) An"as built" elevation certificate must be submitted to the Building Commissioner. <br /> The certificate must indicate the difference between the lowest level of the foundation and the <br /> seasonal high water level of any subterranean aquifer. <br /> (e) Visual inspection of the damp proofing and drainage the must be approved before <br /> the basement is back-filled and construction continues on the project. <br /> SECTION 11. Chapter 6 of the South Bend Municipal Code is amended by the inclusion <br /> of new Section 6-6.7 in Article II which shall read in its entirety as follows: <br /> Sec. 6-6.7 New Well Requirements and Affected Areas. <br /> (a) Before a new well permit is issued in the City, a Soils and Water Table Review <br /> shall be made to the Director of Public Works per Sec 6-6.6 that also includes an Area of <br /> Influence defined as one quarter(1/4) mile radius around the well head. <br /> (b) Before a sub-division that creates new public streets is made in the City, a Soils <br /> and Water Table Review shall be made to the Executive Director of the Area Plan Commission <br /> per Sec. 6-6.6 for inclusion and approval of the sub-division process. All development within <br /> the approved sub-division shall meet the requirements of Sec. 6-6.6 (c)(d)(e) above. <br /> (c) All property owners within the Area of Influence of any proposed new well shall <br /> be notified within thirty(30) days of any submission to a City entity of an intention to drill. <br /> (d) No new well permit shall be issued within a distance of three thousand feet <br /> (3,000') of any existing production well belonging to the City of South Bend in connection with <br /> the city's water supply. <br /> SECTION III. Chapter 6 of the South Bend Municipal Code is amended by the inclusion <br /> of new Section 6-6.8 in Article 11 which shall read in its entirety as follows: <br /> See. 6-6.8 Required Process When Decommissioning a Water Well. <br /> (a) The St. Joseph County Health Officer and the Director of Public Works shall be <br /> notified at least thirty(30) days prior to the decommissioning of any water well. <br /> (b) Whenever a water well has been improperly decommissioned or discontinued for use <br />
The URL can be used to link to this page
Your browser does not support the video tag.