My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Emergency Contract - Installation of Fire Hydrants Proj No 122-053 - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Emergency Contract - Installation of Fire Hydrants Proj No 122-053 - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 11:29:47 AM
Creation date
12/17/2025 11:29:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2833 S. 11th Street, <br />Niles, MI 49120 <br />Phone: 269-684-0842 <br />Fax: 269-684-0846 <br />______________________________________________________________________________ <br />Page 1 of 1 <br />PROPOSAL <br />October 21, 2025 <br />City of South Bend <br />Dept. of Public Works <br />Attn: Mr. Zak Tebell <br />215 S Dr. Martin Luther King, Jr. Blvd. <br />Suite 400 <br />South Bend, IN 46601 <br />Sent via email: ztebell@southbendin.gov <br />RE: CITY OF SOUTH BEND <br />LEXINGTON & DARDEN EMERGENCY HYDRANT INSTALLATION <br />Dear Zak, <br />Selge Construction Co., Inc. is pleased to respond to the City of South Bend’s request for emergency <br />hydrant installation along Darden & Lexington Avenue. We understand the critical nature of this <br />infrastructure and are committed to delivering timely, high-quality service in accordance with the City’s <br />specifications. <br />Thank you for the opportunity to provide you with a proposal for installing nine (9) new City supplied <br />hydrants on Darden & Lexington Avenue in St. Joseph County, Indiana. This proposal is based on plans <br />and specifications supplied by the City of South Bend via email dated 10/17/2025. The cost for each <br />option is listed below: <br />Option #1 – Installation of nine (9) City supplied hydrants with asphalt restoration. <br />Lump Sum Total: $255,500.00 <br />Option #2 – Installation of nine (9) City supplied hydrants with permanent dyed concrete <br /> pavement restoration. <br />Lump Sum Total: $251,000.00 <br />Option #3 – Installation of nine (9) City supplied hydrants with temporary dyed concrete <br /> pavement restoration and permanent asphalt restoration by 5/29/26. <br />Lump Sum Total: $335,500.00 <br />Please review this proposal at your earliest convenience. If you have any questions, please feel free to <br />contact us. We look forward to collaborating with you on this project. <br />Respectfully Submitted: <br />Selge Construction Co., Inc. City of South Bend, DPW <br />Robert P. Kuhns, P.E. Authorized Signature <br />VP Estimating <br />December 16, 2025
The URL can be used to link to this page
Your browser does not support the video tag.