My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify Emergency Contract - Installation of Fire Hydrants Proj No 122-053 - Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Ratify Emergency Contract - Installation of Fire Hydrants Proj No 122-053 - Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 11:29:47 AM
Creation date
12/17/2025 11:29:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/17/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Hydrant Installation <br />Description of Work <br />On October 17, 2025, the City requested an emergency quote from HRP Construction Co. and <br />Selge Construction Co. The project was awarded to the lowest responsible quoter, Selge <br />Construction Co. The project consist of the installation of a total of nine fire hydrants along <br />Darden Road and Lexington Avenue. All hydrants installed have been tested and are fully <br />operational. The total project cost is $255,500.00. An itemized invoice is provided below, along <br />with Selge Construction Co.’s original proposal. <br />Rationale <br />This project was considered an emergency due to the lack of access to adequate fire <br />suppression for residents caused by lack of proximity to fire hydrants as per the City <br />Construction Standards.
The URL can be used to link to this page
Your browser does not support the video tag.