Laserfiche WebLink
rjtru t—I Pjuilding ComPonenta <br />j'acility/ <br />B�y <br />WMB& <br />SBCF Component Package Specification and Data Sheet For: <br />24122456 — Randy Yoder Construction — The Monreaux <br />Big C Lumber SBCF wants to explain what is included in SBC facility's Roof, Floor and Wall Panels, to clarify salesman and framer <br />quoting responsibilities. This information should be communicated to bidders and subcontractors. Please feel free to contact us <br />if you have any questions. <br />Wall Panel Package: <br />Supplied by SBC Assembled <br />• Wall package will include one factory installed single top plate. <br />• Single LSL bottom plate applied to first and second floor only, all other levels single SPF#2 plate applied. <br />• Huber 1-1/2" ZIP R6 is applied to exterior walls only. <br />• Wall package will be all SPF#2 material, unless noted otherwise. <br />• 111 and 2nd floor load bearing walls will be LSL material at the top and bottom plates with double studs at <br />2x4 walls <br />• All stud walls are 2x4's or 2x6's at 16" o.c. <br />• Wall package includes beams in wall as headers only, except as noted below. <br />• Sheathing fastened to wall panels with staples, or D shaped heads, not full round heads. <br />Supplied by SBC Loose <br />No loose lumber is included <br />Excluded from SBC Wall Panel Package <br />• Materials for any top plates above the one installed by SBC and the one included loose by SBC. <br />• Materials for sheathing gables, soffits, Box Joist, etc. <br />• Wall Package will include one row of fire blocking in walls greater than 9' only. <br />o All blocking, reinforcement, extra studs, as required to support/attach equipment, casework, toilet <br />accessories, millwork, and wall mounted hardware, etc. to be supplied and installed by others. <br />• Materials for air infiltration (house wrap) to be supplied by loose lumber package and field installed. <br />• Materials for insulation to be supplied by loose lumber package and field installed. <br />• Materials for vapor barrier to be supplied by loose lumber package and field installed. <br />• Materials for temporary or permanent bracing to be supplied by loose lumber package and field installed. <br />• Package does not include material or labor for lintels, steel or wood beams. <br />• Package does not include material or labor for gable walls, dormers, or chimneys. <br />• Package does not include materials or labor for construction of any soffits, bulk heads, or framing hanging <br />from ceiling. <br />• Materials and installation of any round or curved walls. <br />• Materials and installation for any type of permanent or temporary guard rails. <br />• Materials or labor to glue sheathing to wall panels. <br />• Wall Panels are not Pre -drilled for electrical or mechanicals. <br />• Materials and installation of wall to wall and wall to concrete connections are not included in wall panel <br />package. <br />• Materials and Labor for any walls over 14' tall. <br />• Materials and labor for any steel stud products. <br />• Materials or installation of stairs or landings not included. <br />• Materials and installation of Draft stop products between walls, floor, or roof system. <br />• Materials or installation of Porch beams. <br />• Materials and installation of shear walls above Ceiling to be supplied by loose lumber package. <br />• Steel and exterior deck columns not included / Simpson column caps not included in wall package. <br />• Wall panels and OSB are NOT FSC or fire treated. <br />• Materials and Labor for any 41" floor gable end walls. <br />