My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Etna
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:35:00 PM
Creation date
9/9/2025 2:29:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IRroj+ect N*fa�project No. <br />For Bias pug <br />sCOP'E OF WORK <br />ri,^ DnintP. at RI'verwalk Utility MaterialS. <br />124'06'M <br />L ca Trrn <br />I. PIat7.IECT pESCRIPTI�hI <br />This <br />used !�y Century Custom Builders for the Pointe at <br />his project includes the furnishing of materials to 6 <br />upon the Total Estirnated Price. All items p}�'��.ctual <br />ealk townhome development at I�lorthside St. Peter Street in South Bend. This quote wil e <br />i responsive vert+d!rrr basedp approximate quantities on <br />y <br />awarded to the lowest resg�for each itern are <br />own <br />awarded per unit prices and he ter1elesshthan the quantities shownion the bid tab. <br />quantities purchased may greater <br />PREVAILING SPECIFICATIONS ANZD CONSTI�IJCTIit PI STANDARDS AkhIN SPECIFICATIONS rc�n and <br />NM. PRE <br />A. The City Of South Bend's PRE AILINSPECIFCATIONS,Nmost recent version, ONSmost are to be used on this <br />CONSTRUCTION STANDARDS A <br />project, completelyfamiliar with the most recent <br />g. Each {quote prodder is specifically instructed to become <br />o the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANJ[31�RDS' �`� 6 <br />version uote. <br />SPECIFICATIONS prior to submitting a � <br />ll <br />i,n effective after September t 2025.PREVAILING <br />C. wherever the pP;ErJ,I�ILtNG SPECIFICAeTdOIwIS refer to "State Specrticationsqit sh.hernean e <br />INDOT Standard Specifications for the g <br />be used only in conjunctir�n with the PREVAILINGILII C SPECI ICATIONS, <br />D. These SPECI�wL PROVISIONS I+IS will list only"Additionstoit or DEWAs o <br />SPECIFICATIONS eventTf con and <br />are E. In the event of conflict between the SPECIAL PROVISIONS and the <br />the 'SPECIAL PROVISIONS will govemV <br />Tt=Rxtd "OR EOUAL" <br />A. Prevailing Specifications: None <br />B, Additions <br />n theseaelettertiOnslr the Quote full explaining and deviating from <br />1, 'r�u�lle're the term "'or equal i� ii��Sd i � 1rY determining II r <br />specified item shall file with hislherlits Quote <br />proposed article or equal. The City of South Bend shall be the so1e judge <br />:equal" offered meets the specification. <br />111. TAX_ XEMPT <br />A. Prevailing Specifications; None <br />S, Additions <br />contract with <br />he <br />wner that <br />1. <br />materials and properties purchased under not subject tottheC#ndi na Gross cRetail Tax (Sales Tax). <br />of the structure nr facilities constructed are <br />erl,gitl be furnished to the Contractor upon award, <br />The exemption nurnb <br />INi1Er<IININCATION <br />A. <br />Prevailing Specifications: None <br />B_ Additions <br />P�bdc wc�t�s �iuc�ke <br />
The URL can be used to link to this page
Your browser does not support the video tag.