Laserfiche WebLink
Addendum No. 2 <br />The Pointe oateRiw�o � 2 Ot69Mate <br />aterials <br />Pr <br />pate: g/5/2025 <br />To: All Planholders <br />From: Gemma Stanton, Project Engineer and <br />a receipt <br />of this addendum by signing the first page <br />You must acknowledgeour bid. <br />returning a copy with y <br />Item 24 is specifically 1" copper compression fittings. <br />All items must be priced for quotes to be considered responsive. <br />