My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Core & Main
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Core & Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:29:23 PM
Creation date
9/9/2025 2:28:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OY <br />SCOPE OF WORKYw� <br />CITY OF SOVTH BEND <br />Project Name The Pointe at Riverwalk Utili Materials <br />Project No. 124-069M <br />For Bids Due September 9th, 2025, 9:00 a.m., Local Time <br />PROJECT DESCRIPTION <br />This project includes the furnishing of materials to be used by Century Custom Builders for the Pointe at <br />Riverwalk townhome development at Northside & St. Peter Street in South Bend. This quote will be <br />awarded to the lowest responsive vendor based upon the Total Estimated Price. All items will be <br />awarded per unit prices and the quantities shown for each item are approximate quantities only. Actual <br />quantities purchased may be greater or less than the quantities shown on the bid tab. <br />II. PREVAILING SPECIFICATIONS AND CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and <br />CONSTRUCTION STANDARDS AND SPECIFICATIONS, most recent version, are to be used on this <br />project. <br />B. Each Quote provider is specifically instructed to become completely familiar with the most recent <br />version of the PREVAILING SPECIFICATIONS and the CONSTRUCTION STANDARDS AND <br />SPECIFICATIONS prior to submitting a quote. <br />C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean the 2026 <br />INDOT Standard Specifications for the letting effective after September 1, 2025. <br />D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING SPECIFICATIONS. <br />E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING SPECIFICATIONS, <br />the SPECIAL PROVISIONS will govern. <br />III. TERM "OR EQUAL" <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Where the term "or equal" is used in these specifications, the Quote provider deviating from <br />specified item shall file with his/her/its Quote a letter fully explaining and justifying his/her/its <br />proposed article or equal. The City of South Bend shall be the sole judge in determining if the "or <br />equal" offered meets the specification. <br />IV. TAX EXEMPT <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Materials and properties purchased under contract with the Owner that become a permanent part <br />of the structure or facilities constructed are not subject to the Indiana Gross Retail Tax (Sales Tax). <br />The exemption number will be furnished to the Contractor upon award. <br />V. INDEMNIFICATION <br />A. Prevailing Specifications: None <br />B. Additions <br />Version 1/3/2025 Page -1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.