My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Core & Main
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - The Pointe at Riverwalk Building Utility Materials Proj No 124-069M - Core & Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2025 2:29:23 PM
Creation date
9/9/2025 2:28:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum No. 1 <br />The Pointe at Riverwalk Utility Materials <br />Project No. 124-069M <br />Date: 9/4/2025 <br />To: All Planholders <br />From: Gemma Stanton, Project Engineer <br />You must acknowledge a receipt of this addendum by signing the first page and <br />returning a copy with your bid. <br />The following clarifications to the contract documents are provided: <br />Page 17, Items 25-34: These items are duplicates. Do not include in bid. <br />Use attached revised quote documents for your proposal. <br />Neenah castings are an approved equal to East Jordan Iron Works castings. Either <br />type may be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.