Laserfiche WebLink
6. Dore will clear building materials, and fracture the concrete slab on grade. This will be <br />done using an excavator with hydraulic hammer. <br />7. Dore will backfill and compact voids, pits, and sumps with clean masonry material <br />installing in 8" lifts. <br />8. Dore will perform site grading to ensure proper drainage, <br />Phase V — Recycling <br />Dore will process and transport materials to a recycling center. All steel will be transported to <br />a steel mill where it will be melted for reuse. <br />If any material is deemed non -recyclable, material will be transported to a DEP licensed <br />landfill. <br />Phase VI — Site Grading <br />Dore will haul in clean, compactable soil (if applicable) to fill voids in 8" compactable lifts. <br />Section 4 <br />Substantial Completion and Demobilization <br />Thirty days prior to the contract end date, Dore and the owner's representative will walk the <br />site for the purpose of listing any items that may need to be completed by Dore before the <br />contract end date. <br />Dore will demobilize and remove all equipment from the site. <br />