|
:â– ABONMARCHE PROJECT APPRO,'
<br />PROJECT APPROACH
<br />We have tailored our scope of services to align with the requirements of the RFP, our first-hand experience delivering
<br />roadway, utility, and subdivision projects, and our extensive history working with INDOT and the City of South Bend.
<br />Abonmarche's team is creative, innovative, and deeply experienced in managing all aspects of public infrastructure
<br />projects. Leading our effort is Mike Rozycki, PS, who brings expertise in boundary and topographic surveys, right-of-
<br />way determination, and subdivision platting. His detailed knowledge of the INDOT process and federally funded
<br />projects ensures accuracy and compliance throughout survey, platting, and public right-of-way establishment.
<br />Supporting him is Chad Knip, PE, with over 26 years of civil design and right-of-way management experience on
<br />federally funded LPA projects, specializing in roadway reconstruction, Complete Streets, and utility coordination.
<br />Zach Hauersperger, Staff Engineer, will provide technical design support for stormwater, roadway, and utility systems,
<br />ensuring compliance with IDEM, INDOT, and local standards. Finally, Steve Ruby, PLA, LEED AP, will bring his landscape
<br />architecture expertise to guide streetscape and place -making elements that reinforce the community's vision.
<br />Together, this multidisciplinary team offers the proven leadership and technical depth to deliver a transformative,
<br />cost-effective, and community -focused project for South Bend.
<br />To complement Abonmarche's in-house expertise, we have assembled trusted subconsultants who bring
<br />specialized capabilities essential to the success of this project. K&S Engineers, Inc., with over 40 years of experience
<br />in geotechnical and environmental engineering, will provide foundation design, soils analysis, and materials
<br />engineering services that ensure resilient and cost-effective infrastructure solutions. Their long-standing record of
<br />delivering INDOT-certified services adds another layer of technical assurance.
<br />BOUNDARY SURVEY
<br />Abonmarche will perform a boundary survey in accordance with Indiana "Rule 12" (865 IAC 1-12) to establish
<br />accurate property limits and ensure compliance with state requirements. This effort will be led by Michael Rozycki,
<br />PS, Project Manager and Survey Group Director, who has more than 30 years of experience in boundary and
<br />topographic surveys, right-of-way determination, and easement preparation. Under his direction, survey crews will
<br />provide precise data to support design, platting, and future utility coordination.
<br />PRIMARY PLATTING & MEETINGS
<br />As part of the subdivision process, Abonmarche will revise the primary plat drawing to reflect the project layout in
<br />accordance with the City of South Bend Subdivision Ordinance and application requirements. This includes standard
<br />project and site information, as well as supporting documentation required for City review. With his extensive
<br />background in subdivision platting and route surveys for both federally aided and locally funded infrastructure
<br />projects, Mike will ensure accuracy, efficiency, and compliance throughout this process.
<br />City of South Bend, Howard Park Riverwalk
<br />Proposal for City of South Bend - Western Avenue Transformation District 7
<br />
|