Laserfiche WebLink
14. Provide all known information relative to well locations. <br />V. Delete Section F of Appendix "C" in its entirety and replace as follows: <br />F. After coordination between the OWNER and Memorial Hospital, Bid <br />Package 3 was split into two Bid Packages, 3A and 3B. <br />Bid Package 3A <br />1. The Bid Package was let on April 10, 2012 and constructed in 2012. <br />Bid Package 3B <br />1. Preliminary Plans with the layout was submitted on 10128111. <br />However, the layout has been changed significantly with the new <br />configuration. The updated statement of probable construction <br />costs for the different options were submitted on April 9, 2013. A <br />follow up meeting was held with the OWNER and Memorial Hospital <br />on April 15, 2013. <br />2. Preliminary Plans (50 %) will be submitted within 15 calendar days <br />after the follow up meeting. A review meeting will be held within 7 <br />calendar days after submittal of plans. <br />3. Final Plans (90%) within 15 calendar days after the Preliminary Plan <br />review meeting. A review meeting will be held within 7 calendar days <br />after submittal of plans. <br />4. Final Tracings within 7 calendar days after the Final Plans review <br />meeting. <br />5. The anticipated letting date for Bid Package 3B is June 11, 2013. <br />VI. Revise Section G of Appendix "C" as follows: <br />G. Bid Package 4 <br />1. After coordination between the OWNER and Memorial Hospital, it <br />was decided that the letting for this Bid Package be delayed to 2014. <br />2. Preliminary Plans (50% Plans) are <br />anticipated to be submitted on January 10, 2014. <br />3. Final Plans (90% Plans) within 45 calendar days after approval of <br />Preliminary Plans, includes 7 calendar days of OWNER review time. <br />4. Final Tracings within 30 calendar days after approval of Final Plans, <br />includes 7 calendar days of OWNER review time. <br />5. The anticipated letting date for Bid Package 4 is FebFuary 28, '^" April <br />11, 2014. <br />VII. Section A.1 of Appendix "D" is modified as follows: <br />The ENGINEER shall receive as payment for the work performed under <br />this Agreement the total fee not to exceed of X88 $823,950.00, <br />5of10 <br />Supplemental Agreement No. 3 <br />