My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - The Skillman Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - The Skillman Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:47:49 PM
Creation date
8/26/2025 12:46:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Skillman has worked with many different organizations to upgrade and adapt their facilities to better serve the needs of the <br />communities they serve. We understand the specific needs of occupied park facility projects — specifically with managing safety <br />during construction — and provide cost-effective solutions to make sure they are met. <br />City administration members trust us with their reputation of being a good community leader. Knowing there will be staff members <br />and pool visitors on site during portions of the construction phase, it will be our responsibility to retain safety and security for all. <br />We know every project has specific safety needs dependent upon the setting, site restrictions, and the Owner's operational <br />considerations, so we develop a detailed safety plan around the logistical requirements of your project. This practice ensures <br />that we will isolate construction activity away from the general public and minimize interruptions to park staff and patrons. <br />All safety plans take into consideration site traffic, mobilization, deliveries, seismic and noise restrictions. This is a safety program we <br />have improved upon over the last 53+ years with input from contractors, outside safety consultants, owners, and from our personnel. <br />Your Skillman construction team members are experts in commercial construction and can anticipate potential problems before they <br />happen. Maintaining a safe and secure project requires comprehensive planning before construction begins and constant monitoring <br />through construction. <br />Steps in the Skillman process include: <br />• Before construction begins, detailed logistics planning to ensure construction areas are partitioned or fenced from occupied <br />areas. <br />• Site access and traffic control planned in detail. <br />• All construction personnel required to have criminal background checks and wear identification tags as verification. <br />• Your Skillman Site Manager, Terry Allsop, will meet regularly with park administration to coordinate activities and is accessible <br />at all times to respond immediately to issues. <br />• Safety is an agenda item at every construction progress meeting. <br />Asbestos & Lead Paint <br />Prior to beginning demolition operations, we will obtain from the City a site survey identifying the locations of asbestos and lead <br />containing materials. If the City is unable to provide this information, a testing agency will be employed that can identify and/or <br />verify areas suspected of containing these materials prior to their disturbance during the demolition operation. <br />Noise <br />We will manage start times consistent with the city/county's restrictions and ordinances and will do our best to minimize excessive <br />noise activities while the existing pool is still operational. <br />Jobsite Policies, Background Checks, & Drug Screens <br />As the industry has evolved so has our safety program. Our program requires partners with local agencies who provide detailed <br />checks and testing programs for all construction workers on our projects. Implementing our award -winning safety program involves a <br />detailed identification program that allows us to track every worker that comes on to our job sites daily. <br />Every construction worker on the jobsite is identified with an identification badge and required to have a criminal <br />background check, checks through the Indiana and Federal Sex Offender Registry, and an updated 5-50 drug screen. <br />THE SKILLMAN CORPORATION I KENNEDY PARK RENOVATIONS I PROPOSAL FOR CM/C SERVICES 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.