My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - R. YODER
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - R. YODER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:46:32 PM
Creation date
8/26/2025 12:45:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPENSATION FOR CMc SERVICES <br />` o w $269000 $1370007000 LJ <br />3.79% <br />Preconstruction Fee L] Project Budget CMc Fee <br />+ Based on the narrative within this proposal and 4 months of preconstruction, RYC's fixed <br />preconstruction fee will be a lump sum of $26,000. <br />+ Based on an overall project budget of $13,000,000, RYC's construction management fee <br />to execute the project would be 3.79% of the total cost of work. <br />+ Additional Fees for the Construction Manager include: <br />Project Staffing (based on 18 month duration) _ $482,000 <br />General Conditions (based on 18 month duration) _ $430,000 <br />Bond Rate = 0.60% <br />Corporate General Liability Rate = 0.47% <br />+ General Conditions Costs would include items such asjobsite office trailers, equipment, <br />internet services and office supplies, technology services such as PROCORE, temporary <br />toilets, dumpsters, temporary fencing, construction site cleaning. <br />+ Costs the Owner would be responsible for include items such as Architectural and <br />Engineering fees, state and local approvals, water/sewer tap fees, re-zoning/variance <br />fees, storm water drainage fees, builders risk insurance. <br />+ Cost Overruns and Delays <br />Because of established GMP, all possible cost overruns will be covered by RYC. <br />Should an scope change be necessary, a solution will be reviewed in detail with <br />the entire project team before increasing the GMP. <br />Any schedule concerns will be addressed collaboratively in a team setting. <br />Potential delays will be managed through creative solutions and, if necessary, <br />the addition of supplemental labor. RYC's custom subcontractor agreements <br />allow us to supplement workforce resources if performance issues arise. <br />Should a delay occur beyond the Construction Manager's control, it will <br />be communicated openly with the Owner to ensure a timely and <br />effective resolution. <br />+ Project Contingencies <br />RYC typically recommends an initial construction contingency of approximately <br />3% during the budgeting phase. However, this percentage can be lowered once <br />the construction documents are finalized and the scoping period is completed. <br />This contingency will be closely monitored throughout the project and any <br />unused amount will be returned to the owner. <br />KENNEDY PARK RENOVATION + 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.