My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Kennedy Park Rehabiliation CMc Proj No 125-037 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2025 12:45:27 PM
Creation date
8/26/2025 12:44:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/26/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Original <br />2025 <br />2026 <br />2027 <br />A <br />S <br />O <br />ID Description <br />Start Finish <br />J <br />A <br />S <br />O N D J F M A M J <br />J <br />A S <br />O N D J <br />F <br />M <br />A <br />M <br />J <br />J <br />Duration <br />1 <br />1 <br />Contract <br />:. 0: <br />10 Evaluation <br />15 08/25/25 09/12/25 <br />1 <br />Evaluation <br />I <br />1 <br />20 <br />Tentative Award <br />1 <br />09/15/25 09/15/25 <br />Tentative Award <br />30 <br />Contract Negotiation <br />10 <br />09/16/25 09/29/25 <br />1 <br />Contract Negotiation <br />80 <br />Bidding <br />25 <br />03/10/26 04/13/26 <br />Bidding <br />Award <br />of <br />Second <br />Tier Contracts <br />j <br />90 <br />Award of Second Tier Contracts <br />20 <br />04/14/26 05/11/26 <br />XBE Process <br />115 <br />0• <br />1 <br />1 <br />I <br />25 <br />Prepare Outreach Plan <br />20 <br />09/16/25 10/13/25 <br />1 <br />T1 <br />Prepare Outreach Plan <br />1 <br />27 <br />XBE Subcontractor Outreach Publication 1 <br />45 <br />10/14/25 <br />12/15/25 <br />1 <br />1 <br />(BE,Subconitractor Outreach <br />Publication <br />1 <br />28 <br />XBE Outreach Event <br />5 <br />12/16/25 <br />12/22/25 <br />1 <br />XBE Outreach Event <br />29 <br />XBE Outreach 2 <br />40 <br />12/23/25 <br />02/16/26 <br />XBE Outreach 2 <br />35 <br />XBE Event <br />5 <br />02/17/26 <br />02/23/26 <br />I <br />XBE Event <br />I I <br />BudgetingDesign and <br />1 <br />1 <br />40 <br />Initial Budget Development <br />20 <br />09/30/25 <br />10/27/25 <br />I <br />1 <br />; <br />Initial Budget Developmeht <br />II <br />Evaluation of Budget. I <br />DesignlDevelopment <br />1 <br />1 <br />I <br />45 <br />Evaluation of Budget <br />5 <br />10/28/25 <br />11/03/25 <br />47 <br />Design Development <br />40 <br />11/04/25 <br />12/29/25 <br />50 <br />Design Development Budget <br />15 <br />12/30/25 <br />01/19/26 <br />1 <br />1 <br />Design Development <br />Evaluation of DIDBudget <br />Creation of CD's <br />BudgeNorthEast <br />Budget <br />60 <br />Evaluation of DIDBudget <br />5 <br />01/20/26 <br />01/26/26 <br />65 <br />Creation of CD's <br />30 01/27/26 03/09/26 <br />70 <br />CD Budget <br />10 03/10/26 03/23/26 <br />CD t• <br />1 <br />1 <br />I <br />Area (Aquatic and Courts) <br />294 05/12/26 0. <br />95 Mobilization <br />10 05/12/26 05/25/26 <br />1 <br />Mobilization <br />Major Excavation <br />and Infrastructure <br />1 <br />100 <br />Major Excavation and Infrastructure <br />40 <br />05/26/26 <br />07/20/26 <br />102 <br />Parking lot Construction <br />40 <br />07/21/26 <br />09/14/26 <br />I <br />Parking lot Construction <br />ool Tank Construction <br />Accessory <br />Buildings <br />C <br />1 FA <br />Construction <br />105 <br />Pool Tank Construction <br />60 <br />07/21/26 <br />10/12/261 <br />107 <br />Accessory Buildings Construction <br />80 <br />10/13/26 <br />02/01/27 <br />�I <br />-0 <br />a 1 <br />C <br />M <br />C <br />•Install- Gutters, <br />(Fall) <br />Winter <br />I � <br />Activiti <br />Inclusive <br />I <br />� <br />�' <br />es.Shut <br />PlayGround <br />down <br />C <br />110 <br />Install Gutters (Fall) <br />20 <br />10/13/26 <br />11/09/26 <br />113 <br />Winter Activities Shut down <br />79 <br />11/10/26 <br />02/26/27 <br />109 <br />Inclusive PlayGround Construction <br />40 <br />03/01/27 <br />04/23/27 <br />Start Date: 08/25/25 <br />Finish Date: 06/25/27 <br />Data Date: 08/25/25 <br />Run Date: 08/25/25 <br />Basic Schedule.ppx <br />City of South Bend <br />Kennedy Park <br />Preliminary Schedule <br />RMLARSON <br />DANIELSON <br />Page 1A I I Page 18 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.