Laserfiche WebLink
PROJECT APPROACH <br />3.Sustainability <br />Garmong recognizes the City of South Bend's vision for Kennedy Park as a long-lasting, inclusive, and environmentally <br />responsible community asset. As CMc, we will actively support sustainable decision -making throughout design, preconstruction, <br />and construction phases. Our approach includes: <br />Material and System Selection for Longevity <br />Aquatics Center: We will recommend and validate the specifications include UV -resistant, anti -corrosive materials <br />for pool structures, shade systems, and seating to withstand seasonal weather and chlorinated environments. Pool <br />mechanical systems will be evaluated for energy efficiency, low maintenance, and long-term reliability, including <br />variable frequency drives (VFDs), high -efficiency pumps, and automated chemical dosing systems. <br />Playground and Sports Amenities: We will guide selection of impact -resistant surfacing, powder -coated steel <br />structures, and weatherproof coatings to reduce replacement cycles and maintenance costs <br />Energy and Water Efficiency <br />Aquatics Operations: We will support the integration of high -efficiency filtration systems, low -flow fixtures, and solar - <br />ready infrastructure to reduce energy and water consumption. We will also suggest heat recovery systems for pool <br />water heating. <br />Concessions and Restrooms: Recommendations will include LED lighting, occupancy sensors, and low -flow plumbing <br />fixtures to reduce utility costs. <br />Electric Vehicle (EV) Infrastructure: We will recommend conduit installation for future EV charging stations, aligning <br />with South Bend's sustainability goals. <br />Landscape and Site Sustainability <br />Native Plantings: We will coordinate with DLZ to ensure low -maintenance native species are used, reducing irrigation <br />needs and supporting biodiversity. <br />Tree Planting and Shade: Over 200 trees will be planted to provide natural cooling, reduce heat island effects, <br />and enhance long-term park aesthetics. Planting trees in the fall is considered a best practice because cooler <br />temperatures and increased soil moisture help roots establish before winter dormancy, promoting healthier growth in <br />the spring. <br />Stormwater Management: We will support the use of permeable paving, bioswales, and rain gardens to manage <br />runoff and improve water quality. <br />Lifecycle Cost Analysis and Maintenance Planning <br />Garmong will work directly with DLZ to provide pricing for comparative products and the associated lifecycle <br />cost expectations for major systems and materials, helping the City make informed decisions that balance upfront <br />investment with long-term savings. <br />We will collaborate with City maintenance teams to ensure selected systems align with available resources and <br />staffing, minimizing future burdens. <br />This approach ensures that Kennedy Park remains a resilient, cost-effective, and environmentally responsible space for <br />generations. <br />1h <br />GARMONG <br />Kennedy Park Renovation I 0 <br />Garmong Construction <br />