23.5. Develop PLC and HMI application software associated with the Project. Application <br />software will be based on the standards established with the Owner during the pre- <br />programming phase of the construction of the Project, and will be integrated into the <br />plant -wide process control system network. It is estimated that 140 new input/output (1/0) <br />points will be added. <br />23.6. Install and test PLC and HMI application software developed by the Application Engineer. <br />Modify tested software to incorporate changes agreed to between the Owner and <br />Application Engineer. <br />23.7. Configure remote alarm notification via the WIN-911 software package if upgraded in this <br />Project. Incorporate new remote alarms into the existing or updated WIN-911 package. <br />23.8. Configure the HMI to allow remote access to the system. <br />23.9. Prepare an operation and maintenance manual for the new PLC and HMI application <br />software. The manual will serve as the basis for training provided by Application Engineer. <br />23.10. Provide two (2) days of on -site training of Owner operations and maintenance personnel in <br />the use of the PLC and HMI application software configurations provided. <br />23.11. Deliverables: <br />23.11.1. One (1) copy of PLC and HMI program documentation in electronic format. <br />23.11.2. Three (3) hardcopies and one (1) electronic copy of the O&M Manual prepared <br />for this project. O&M Manual electronic copy will be MSWord with supporting <br />material in PDF. <br />23.12. TCP/IP Addresses for all Ethernet communication modules shall be coordinated with the <br />Owner." <br />Task Order Scope Conditions <br />Scope of Service is based on the assumption that the Project will consist of one (1) construction <br />contract and one (1) associated Contractor. Additional construction contracts and Contractors may <br />result in additional services (meetings, submittals, payment applications, coordination, startup <br />services, field visits, etc.) that are not accounted for in the Scope of Services for this Task Order <br />#10. If the Project consists of multiple construction contracts and/or Contractors, additional <br />related services may be provided as a part of another Task Order or Addendum. <br />• At the time of preparation of this Task Order #10, the following tasks are assumed to not be <br />required and thus, are not included in the Task Order #10 Scope of Services (these services may be <br />provided as a part of an associated Task Order(s) or Addendum): <br />o American Iron and Steel (AIS) or Buy America, Build America (BABA) compliance oversight. <br />o Wage Scale Monitoring. <br />o Factory testing for process control system programmable logic controller (PLC) panels at <br />system supplier's facility. <br />o Resident Project Representative (RPR) Services. <br />B. PROJECT TIMING <br />Bid awards are anticipated to be made on July 8, 2025, with Contractor notice -to -proceed issued by <br />August 4, 2025. The Construction Contract is anticipated to be Substantial Complete in <br />Page 8 of 9 <br />