on Donohue to make any examination to ascertain how or for what purposes <br />Contractor has used the moneys paid on account of the Contract Price, or to determine <br />that title to any portion of the work in progress, materials, or equipment has passed <br />to the OWNER free and clear of any liens, claims, security interests, or encumbrances, <br />or that there may not be other matters at issue between the Owner and Contractor <br />that might affect the amount that should be paid. Prior to recommending payment <br />requests from Contractor to the Owner for payment, Donohue shall require lien <br />waivers from prior payment applications from Contractor. <br />15.1.3. This proposal is based on the anticipated review of twelve (12) pay applications. <br />16. Instrumentation and Control (I&C) Verification Services. <br />16.1. Attend on -site field testing of process control system PLC panels after installation to check <br />input and output signal wiring. Verify process control system programming meets <br />requirements of functional descriptions. One (1) day of on -site PLC field testing is anticipated. <br />17. Contractor's Completion Documents. <br />17.1. Receive and review maintenance and operating instructions, schedules, and guarantees. <br />17.2. Receive bonds, certificates, or other evidence of insurance not previously submitted and <br />required by the Contract Documents, certificates of inspection, tests and approvals, Shop <br />Drawings, Samples, and the annotated record documents, which are to be assembled by <br />Contractor in accordance with the Contract Documents to obtain final payment. <br />17.3. Donohue shall transmit these documents to Owner. <br />18. Substantial Completion. <br />18.1. Promptly after notice from Contractor that the Contractor considers the entire Work ready for <br />its intended use, in the company of Owner and Contractor, conduct an inspection to determine <br />if the Work is Substantially Complete. Donohue shall prepare a list of any observed deficiencies <br />during the inspection. <br />18.2. At the direction of the Owner, Donohue shall prepare and deliver a certificate of Substantial <br />Completion to Owner and the Contractor. <br />19. Startup and Training Services <br />19.1. Training by the equipment manufacturers will be scheduled to take place prior to, or during, <br />system demonstrations. <br />19.2. Prepare startup plans as applicable to coordinate the responsibilities of the Contractor and the <br />Owner at the time when construction is substantially complete. Submit the startup plans to <br />the Owner and Contractor for review. Respond to questions and incorporate recommended <br />changes into the startup plan. <br />Page 6 of 9 <br />