Laserfiche WebLink
REGULAR MEETING AUGUST 12, 2025 167 <br />APPROVE CHANGE ORDER NO. 1 - 2025 GUARDRAIL IMPROVEMENTS — PROJECT NO. <br />124-026(1`0-00040530� <br />President Maradik advised that Lidya Abreha, Engineering, has submitted change order number 1 <br />on behalf of C-Tech Corporation, indicating the contract amount be increased by $31,935 for a <br />new contract sum, including this change order, in the amount of $230,591. Upon a motion made <br />by VP Molnar, seconded by Mr. Miller and carried by roll call, the change order was approved. <br />APPROVE CHANGE ORDER NO.6 — MLK DREAM CENTER — PROJECT NO. 121-066 (PO- <br />00027136 <br />President Maradik advised that Patrick Sherman, Engineering, has submitted change order number <br />6 on behalf of C.H. Garmong & Son, Inc., indicating the contract amount be increased by <br />$358,994.35 for a new contract sum, including this change order, in the amount of $25,221,303.74. <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the change <br />order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — POTAWATOMI POOL DEMOLITION — <br />PROJECT NO. 124-023A (PO-0037119) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted the project completion <br />affidavit on behalf of Green Demolition Contractors, Inc., for the above referenced project, <br />indicating a final cost of $195,900. Upon a motion made by VP Molnar, seconded by Mr. Miller <br />and carried by roll call, the project completion affidavit was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — SOUTH BEND MEDICAL <br />FOUNDATION DEMOLITION — PROJECT NO. 123-076 (PO-0031911) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted the project completion <br />affidavit on behalf of The MRD Group, Inc., for the above referenced project, indicating a final <br />cost of $1,638,562.50. Upon a motion made by VP Molnar, seconded by Mr. Miller and carried <br />by roll call, the project completion affidavit was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — DEMOLITION OF THE FORMER <br />YMCA BUILDING — PROJECT NO. 124-055 (PO-0034095) <br />President Maradik advised that Kyle Ludlow, Engineering, has submitted the project completion <br />affidavit on behalf of Green Demolition Contractors, Inc., for the above referenced project, <br />indicating a final cost of $1,680,800. Upon a motion made by VP Molnar, seconded by Mr. Miller <br />and carried by roll call, the project completion affidavit was approved. <br />APPROVE CERTIFICATE OF SUBSTANTIAL COMPLETION — WWTP SOLAR ENERGY <br />SAVINGS CONTRACT —PROJECT NO. 124-015 (PO-0035380) <br />President Maradik advised that Gemma Staton, Engineering, has submitted the certificate of <br />substantial completion on behalf of Veregy, LLC, indicating a substantial completion date of <br />March 1, 2025 for the above project. Upon a motion made by VP Molnar, seconded by Mr. Miller <br />and carried by roll call, the certificate of substantial completion was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — DEMOLITION OF RABBI SHULMAN APARTMENTS — PROJECT NO. 123-048 <br />(PR-00042469) <br />In a memorandum to the Board, Zach Hurst, Engineering, requested permission to advertise for <br />the receipt of bids for the above referenced project. Also presented at this time for approval and <br />execution was the title sheet. Upon a motion made by VP Molnar, seconded by Mr. Miller and <br />carried by roll call, the above request to advertise was approved, and the title sheet was approved <br />and signed. <br />APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA <br />The following agreements/contracts/proposals/addenda were submitted to the Board for approval: <br />Type <br />Business <br />Description <br />Amount/ <br />Funding <br />Motion/ <br />Second <br />Ratify <br />Selge <br />Emergency Repair Work <br />$48,980.41 <br />Molnar/Miller <br />Emergency <br />Construction <br />to Excavate, replace pipe, <br />PO-0038480 <br />Sewer Repair <br />Co., Inc. <br />and restore the road at the <br />Ewing Ave. and High St. <br />Intersection <br />