Laserfiche WebLink
Omega performed a three -phased demolition of three structures totaling over 3500' in length leading from NB and SB <br />Lake Shore Drive to Outbound I-55. Demolition took place over I-55, Lake Shore Drive, additional side streets, as well <br />as overactive METRA and CN tracks with live catenaries. Omega recycled 100% of the materials on the project. <br />PennDOT-SR95 SEC GR3 / I-95 Reconstruction Philadelphia, PA Omega performed the demolition of a 7000' elevated <br />section of NB I-95 through Philadelphia, along with various ramps and sign structures. Work took place over numerous <br />roads and Conrail tracks. The work was performed in three phases to allow traffic to continue on the roadway. All <br />material from the project was recycled. Project was completed ahead of schedule and under budget. <br />Select Past Proiects <br />Midway Airport - Chicago, IL <br />Demolished 200,000 sqft former airport and control tower. <br />Johns Manville Plant - Waukegan, IL <br />Decommission 2 million sgft former asbestos manufacturing plant. <br />Dan Ryan Reconstruction Proiect - Chicago, IL <br />Removal of 15 fly over bridges and 5,000 LF of retaining walls and ramps. <br />Regan Memorial Toll -way Reconstruction — Chicago, IL <br />Demolition of 5 bridges including 2 interchanges. <br />Peppers Ferry Bridge over New River — West Virginia <br />Explosive demolition and retrieval of truss bridge over the New River. 1-88 over <br />Fox River Bridge - Fox River, IL <br />Demolition of a 5 arched concrete bridge over the Fox River. <br />Lehigh/Pohopoco Bridge - Palmerton, PA <br />Demolition of two 1,350' long truss bridges including explosive demolition. <br />Z-70 Blanchette Bridge over Missouri River - St, Charles, MO <br />Demolition of 23 span 4.083 ft long truss bridge. <br />CTA Purple Line (Roll in) - Chicago, IL <br />Demolition and removal of 3 rail overpasses in 24 hours. <br />Halstead Bascule Bridge - Chicago, IL <br />Demolition and removal of 1930ft bascule bridge over the Chicago River. <br />Chicago Housing Authority - Chicago, IL <br />Demolition of several buildings throughout the city of Chicago, ranging from 7-17 stories. <br />Columbus Hospital - Chicago, IL <br />Asbestos abatement, demolition, and hazardous material removal of 3 buildings, 3-14 stories each. <br />New Page Paper Mill -Kimberly. WI <br />DEMOLITION I ENVIRONMENTAL I INDUSTRIAL <br />31W566 Spaulding Road; Elgin, IL 60120 <br />P: 630.837.3000 1 F: 630.837.2300 <br />www.omega3llc.com <br />