building. Structures to be demolished ranged from 3- 12 stories and included a powerhouse, 220' stack, and a <br />generator building. Hard debris was recycled onsite and used for site restoration. <br />Caterpillar Building 1 System 76 Demolition - Morton, IL <br />Project: Approximately 390,000 square feet demolition of a 5 level manual pull retrieval and racking storage <br />system for installation of a new computerized high speed automated retrieval, racking and storage system at the <br />Morton Caterpillar Parts Distribution Center. <br />Former Cargill Facility - Chicago, IL <br />Project: Directly adjacent to the Calumet Channel, and active railroad tracks, demolished 271 concrete grain silos, <br />each standing 130 feet, plus a 215ft head house —all concrete was crushed onsite to produce granular backfill . <br />O'Hare International FedEx Terminal & United Airline's Cargo Facility - Chicago, IL <br />Demolished the FedEx Terminal and United Airline's Cargo Facility. Demo included 292,395 sq ft slab on grade <br />steel plus 2 story 464,580 sq ft steel structure and its 207,900 basement. 90% of debris was recycled Location: <br />Chicago, IL <br />DEMOLITION I ENVIRONMENTAL I INDUSTRIAL <br />31W566 Spaulding Road; Elgin, IL 60120 <br />P: 630.837.3000 1 F: 630.837.2300 <br />www.omega3llc.com <br />