My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Omega III LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Omega III LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 1:47:00 PM
Creation date
8/12/2025 1:45:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
Text box
ID:
1
Creator:
Created:
8/12/2025 1:45 PM
Modified:
8/12/2025 1:45 PM
Text:
http://www.omega3llc.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
etc. to strip the apartment units down to the framing studs. Work was completed to customer's satisfaction in approx. <br />3 weeks. <br />Restaurant Bar & Grill Demolition — Rosemont IL <br />Performed total demolition of building structure which formerly contained a family restaurant and a separate bar and <br />grill. The building was wrecked, and all debris was sorted by debris type for recycling and/or disposal. The basement <br />foundation was partially demolished per project specifications. The site was then backfilled with imported clay and <br />compacted to 80%-85% density for future redevelopment by others. <br />Children's Memorial Hospital - Chicago, IL <br />Located in Chicago's exclusive Lincoln Park neighborhood, the Children's Memorial Hospital project required asbestos <br />and lead abatement followed by complete building demolition and onsite debris recycling. <br />Catholic Retreat Center Abatement & Demolition — Chicago, IL <br />This project included the total demolition & site restoration of a Catholic Retreat complex in a residential area of the <br />congested Lincoln Park neighborhood of Chicago. The complex included (2) 7-story buildings linked with a chapel. The <br />buildings were carefully wrecked to the ground utilizing both excavators with high reach attachments equipped with <br />grapples as well as manual Laborers on scaffolding using hand-held impact hammers. <br />5--Story Medical Center Building Complete & Selective Demolition — Chicago, IL <br />The project included total demolition of (1) 4-story medical center and selective demolition of the attached/connected <br />5-story medical building to its south. The (2) buildings were carefully separated at the connection point to allow the full <br />demolition of the 4-story building without negative impacts on the 5-story building scheduled to remain for renovations. <br />Former 611' Grade School Center Demolition — Crete IL <br />The project included the total demolition & site restoration of the Crete Township 6th Grade School Center & Field <br />House. The School Center building was the original home to Crete Township's High School. The field house was a <br />domed structure that served the original high school's athletic teams. <br />National Plaza Building Demolition — Schaumbura IL <br />The project included the total demolition of an 8-story office building and parking lot in Schaumburg, IL. The building <br />was wrecked via excavators with a high reach booms and grapple attachment. The entire parking lot asphalt, curbs, <br />light posts, and landscaping hubs surrounding the building were also demolished. <br />Select Past Projects <br />Springfield Avenue Pumping Station - Chicago, IL <br />Performed lead & asbestos abatement; asset recovery; & total and selective structural demolition to facilitate the <br />station's conversion from steam turbines & boilers to electric motors. <br />Cook Countv/Stroger Hospital Demolition - Chicago, IL <br />The Stroger Hospital Campus is located in the heart of Chicago's downtown medical district and surrounded by <br />several high rise, occupied buildings in very close proximity. In addition to the challenging environment, the <br />scope of work included the surgical separation of structures to be demolished from the historic main hospital <br />DEMOLITION I ENVIRONMENTAL I INDUSTRIAL <br />31W566 Spaulding Road; Elgin, IL 60120 <br />P: 630.837.3000 1 F: 630.837.2300 <br />www.omega3llc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.