My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Omega III LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Cleanup of South Bend Range, Phase I Proj No 125-020A - Omega III LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 1:47:00 PM
Creation date
8/12/2025 1:45:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/12/2025
Text box
ID:
1
Creator:
Created:
8/12/2025 1:45 PM
Modified:
8/12/2025 1:45 PM
Text:
http://www.omega3llc.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Midway Airport - Chicago, IL <br />Demolished 200,000 sqft former airport and control tower. <br />Johns Manville Plant - Waukegan, IL <br />Decommission 2 million sqft former asbestos manufacturing plant. <br />Dan Ryan Reconstruction Proiect - Chicago, IL <br />Removal of 15 fly over bridges and 5,000 LF of retaining walls and ramps. <br />Regan Memorial Toll -way Reconstruction — Chicago, IL <br />Demolition of 5 bridges including 2 interchanges. <br />Peppers Ferry Bridge over New River — West Virginia <br />Explosive demolition and retrieval of truss bridge over the New River. 1-88 over <br />Fox River Bridge - Fox River, IL <br />Demolition of a 5 arched concrete bridge over the Fox River. <br />Lehigh/Pohowco Bridge - Palmerton, PA <br />Demolition of two 1,350' long truss bridges including explosive demolition. <br />1-70 Blanchette Bridge over Missouri River - St, Charles, MO <br />Demolition of 23 span 4.083 ft long truss bridge. <br />CTA Purple Line (Roll In) - Chicago, IL <br />Demolition and removal of 3 rail overpasses in 24 hours. <br />Halstead Bascule Bridge - Chicago, IL <br />Demolition and removal of 1930ft bascule bridge over the Chicago River. <br />Chicago Housing Authority - Chicago, IL <br />Demolition of several buildings throughout the city of Chicago, ranging from 7-17 stories. <br />Columbus Hospital - Chicago, IL <br />Asbestos abatement, demolition, and hazardous material removal of 3 buildings, 3-14 stories each. <br />New Page Paper Mill -Kimberly, WI <br />Partial demolition of 200,000 sqft of industrial building. <br />O'Hare International /FedEx 10-C - Chicago, IL <br />Demolition of the FedEx Terminal and United Airline's Cargo Facility. Demo included 292,395 sq ft slab on grade steel <br />plus 2 stoiy 464,580 sq ft steel structure and its 207,900 basement. 90% of debris was recycled <br />Congress Parkway Bascule; Chicago, IL - Dismantlement of a four-leaf bascule bridge over the Chicago River. <br />DEMOLITION I ENVIRONMENTAL I INDUSTRIAL <br />31W566 Spaulding Road; Elgin, IL 60120 <br />P: 630.837.3000 1 F: 630.837.2300 <br />www.omega3llc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.