Laserfiche WebLink
foundation was partially demolished per project specifications. The site was then backfilled with imported clay and <br />compacted to 80%-85% density for future redevelopment by others. <br />Catholic Retreat Center Abatement & Demolition — Chicago, IL <br />This project included the total demolition & site restoration of a Catholic Retreat complex in a residential area of the <br />congested Lincoln Park neighborhood of Chicago. The complex included (2) 7-story buildings linked with a chapel. The <br />buildings were carefully wrecked to the ground utilizing both excavators with high reach attachments equipped with <br />grapples as well as manual Laborers on scaffolding using hand-held impact hammers. <br />5--Story Medical Center Building Complete & Selective Demolition — Chicago, IL <br />The project included total demolition of (1) 4-story medical center and selective demolition of the attached/connected <br />5-story medical building to its south. The (2) buildings were carefully separated at the connection point to allow the full <br />demolition of the 4-story building without negative impacts on the 5-story building scheduled to remain for renovations. <br />Former 6t11 Grade School Center Demolition — Crete IL <br />The project included the total demolition & site restoration of the Crete Township 6th Grade School Center & Field <br />House. The School Center building was the original home to Crete Township's High School. The field house was a <br />domed structure that served the original high school's athletic teams. <br />National Plaza Building Demolition — Schaumburg, IL <br />The project included the total demolition of an 8-story office building and parking lot in Schaumburg, IL. The building <br />was wrecked via excavators with a high reach booms and grapple attachment. The entire parking lot asphalt, curbs, <br />light posts, and landscaping hubs surrounding the building were also demolished. <br />Children's Memorial Hospital - Chicago, IL <br />Located in Chicago's exclusive Lincoln Park neighborhood, the Children's Memorial Hospital project required asbestos <br />and lead abatement followed by complete building demolition and onsite debris recycling. <br />LakeviewApartments East Chicago, IN <br />Project consisted of complete demolition of a 9-story apartment building. Hard debris was recycled onsite and used for <br />site restoration. I-90/94 Flyover at I-290 Circle Interchange Chicago, IL Demolition on the project was performed in two <br />phases. The first phase consisted of complete removal of a 239' three -span ramp from NB I-90/94 to Congress <br />Parkway. The second phase was the complete removal of a 456' seven -span ramp from NB I-90/94 to WB I-290. All <br />bridge components were recycled. <br />I-55 at Lake Shore Dr, Chicago, IL <br />Omega performed a three -phased demolition of three structures totaling over 3500' in length leading from NB and SB <br />Lake Shore Drive to Outbound I-55. Demolition took place over I-55, Lake Shore Drive, additional side streets, as well <br />as overactive METRA and CN tracks with live catenaries. Omega recycled 100% of the materials on the project. <br />PennDOT-SR95 SEC GR3 / I-95 Reconstruction Philadelphia, PA Omega performed the demolition of a 7000' elevated <br />section of NB I-95 through Philadelphia, along with various ramps and sign structures. Work took place over numerous <br />roads and Conrail tracks. The work was performed in three phases to allow traffic to continue on the roadway. All <br />material from the project was recycled. Project was completed ahead of schedule and under budget. <br />Select Past Proiects <br />DEMOLITION I ENVIRONMENTAL I INDUSTRIAL <br />31W566 Spaulding Road; Elgin, IL 60120 <br />P: 630.837.3000 1 F: 630.837.2300 <br />www.omega3llc.com <br />