Laserfiche WebLink
REGULAR MEETING <br />JULY 22, 2025 151 <br />1703 S. Ironwood Drive <br />South Bend, IN 46613 <br />Ken.hoy&slatile.com <br />Bid was signed by Mr. Dan Howard <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendums Acknowledgements received. <br />:n <br />Base Bid Total <br />$541,812 <br />Alternate Total <br />$84,000 <br />Item No. 1 <br />$2,600 <br />Item No. 2 <br />$325 <br />Item No. 3 <br />$375 <br />WOLF COMMERCIAL ROOFING, INC <br />1319 N. Iowa <br />South Bend, IN 46628 <br />Sunrue&wolfcroof. com <br />Bid was signed by Mr. Stephen Unrue <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />One (1) Forms MWBE-1.0, 2.0, 2.1 were complete. <br />Zero (0) of One (1) Addendum(s) Acknowledgement received. <br />no <br />Base Bid Total <br />$507,710 <br />Alternate Total <br />$84,920 <br />Item No. 1 <br />$2,080 <br />Item No. 2 <br />$215 <br />Item No. 3 <br />$245 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />bids were referred to Engineering for review and recommendation. <br />OPENING OF BIDS — MILKWEED COMMONS ROOF REPLACEMENT — PROJECT NO. <br />125-021B (PR-00041683) <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following Bids were opened and publicly read: <br />RELIABLE ROOFING AND CONSTRUCTION <br />2048 E. Ireland Road - Suite A <br />South Bend, IN 46614 <br />abraham(,reliableroofingonline. com <br />Bid was signed by Mr. Abraham Gordillo <br />Non -Collusion, Non -Discrimination Affidavit Form was incomplete <br />Five percent (5%) Bid Bond was submitted. <br />Two (2) Forms MWBE-1.0, 2.0, 2.1 were submitted. <br />One (1) of Two (2) Addendum Acknowledgements received. <br />Base Bid, Division A <br />$77,610 <br />Base Bid, Division B <br />$302,415 <br />Alternate #1, Division A <br />$47,900 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />bids were referred to Engineering for review and recommendation. <br />