My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Lathrop Water Main Loop Proj No 125-035 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:50:58 AM
Creation date
8/12/2025 11:49:33 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Assist Owner in advertising for and obtaining bids or proposals for the Work and, where <br />applicable, maintain a record of prospective bidders to whom Bidding Documents have <br />been issued, attend pre -bid conferences, if any, and receive and process contractor deposits <br />or charges for the bidding documents. <br />2. Issue addenda as appropriate to clarify, correct, or change the bidding documents. <br />Provide information or assistance needed by Owner in the course of any negotiations with <br />prospective contractors. <br />4. Consult with Owner as to the acceptability of subcontractors, suppliers, and other <br />individuals and entities proposed by prospective contractors for those portions of the Work <br />as to which such acceptability is required by the bidding documents. <br />5. If bidding documents require, the Engineer shall evaluate and determine the acceptability <br />of "or equals" and substitute materials and equipment proposed by bidders, but subject to <br />the provisions of paragraph A2.02.A.2 of this Exhibit A. <br />6. Attend the Bid opening, prepare Bid tabulation sheets, and assist Owner in evaluating Bids <br />or proposals and in assembling and awarding contracts for the Work. <br />B. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase or upon cessation of negotiations with prospective contractors (except as may <br />be required if Exhibit F is a part of this Agreement). <br />A1.05 Construction Phase <br />C. Upon successful completion of the Bidding and Negotiating Phase, and upon written authorization <br />from Owner, Engineer shall: <br />1. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />2. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. <br />3. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />PART 2 — ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner's Written Authorization <br />Page 7 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.