Laserfiche WebLink
a. Exploration: Split -spoon samples, collected in accordance with ASTM D-1586 <br />methodology, will be obtained at 2.5-ft intervals in the upper 10-ft and at 5-ft intervals <br />thereafter. <br />b. Groundwater: Groundwater measurements will be obtained during and after <br />completion of our drilling program. <br />c. Backji'lling or Boreholes: Following completion of the drilling activities, the borings <br />will be backfilled with soil cuttings <br />3. PUBLIC UTILITY LOCATE: GME Testing will contact public utility entity to notify <br />public utility members of the area to be marked. <br />4. PRIVATE UTILITIES: It is our experience that public utility companies do not mark the <br />locations of privately -owned utilities. This proposal is based on private utility lines (if <br />present on site) and other subsurface appurtenances are located in the field by others prior <br />to field activities. GME Testing will exercise reasonable caution to avoid damages to <br />underground utilities by contacting local utility companies prior to the field activities. <br />However, private utility locations are often unknown by public utility companies and <br />should be confirmed by the utility owners (if present on site). <br />5. LABORATORY TESTING: Samples recovered from the split -spoon sampler will be <br />sealed in clean, airtight glass jars, labeled, and transported to our laboratory for further <br />classification and testing. This will include but not limited to grain size, Atterberg limits, <br />infiltration testing, moisture content, unconfined compressive strength, organic content, <br />and soil classifications according to ASTM D-2487, ASTM D-4318, ASTM D421, etc. <br />6. ANALYSIS AND PRESENTATION: The results of our field exploration and laboratory <br />tests will be used in the engineering analysis and in the preparation of the <br />recommendations for watermain installation and underground stormwater detention <br />design parameter recommendations. The exploration results, conclusions, and <br />recommendations will be presented in a formal written report for use by civil and design <br />engineers in preparing the site and project plans. <br />A1.05 50% Preliminary Design Plans <br />A. Engineer shall: <br />1. Design for resurfacing of Lathrop St, from Bendix Dr to Portage Ave. from the curb return. <br />This design will consist existing two HMA lanes, one in each direction, three (3) concrete <br />speed humps, and site restoration. <br />2. Design a new 12" wrapped ductile iron water main from Bendix Dr to Portage Ave, which <br />will replace the existing 6" water main. The proposed 12" water main will be installed near <br />the south right-of-way and will include tying in the existing 6" water mains along Olive St <br />and Johnson St. The existing 6" water main running along Lathrop St will be plugged and <br />abandoned. <br />3. Perform or provide the following 50% Preliminary Design Phase tasks or deliverables: <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />