My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 7 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 7 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:48:11 AM
Creation date
8/12/2025 11:47:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B161A24C-C99E-4417-A240-3BE587F7544E <br />Mr. Zach Hurst <br />July 28, 2025 <br />Page 4 <br />J. Roadway design coordination efforts including schematic layouts utilizing aerials and a <br />high-level opinion of probable construction cost (OPCC) forthe recommended solution will <br />be provided. <br />K. Develop a concise traffic impact study report that summarizes the analysis results and any <br />resulting roadway infrastructure recommendations for the study intersections to <br />accommodate the generated traffic from the proposed development site. The report will <br />include figures that illustrate the traffic volumes and intersection recommendations, <br />including recommended turn lane lengths, if needed. <br />L. Structurepoint will perform a revised trip distribution and assignment based upon <br />the additional land uses and the revised site access alternatives. <br />M. Additional alternative analysis for the intersection of Main Street & Marion <br />Street/Site Driveway to determine how to handle pedestrians and entering/exiting <br />traffic. Additional alternatives include the following: <br />• All way stop control <br />• Limited access eliminating turning movements at the Site Driveway <br />N. Perform VISSIM analysis and visualization of proposed roundabout at Main Street & <br />Marion Street/Site Driveway <br />• Update pedestrian evaluation as needed due to proposed changes in proposed <br />site uses. <br />O. Attend up to 3) seven (7) meetings including: <br />• One (1) initial meeting to verify the scope of the traffic study before performing the <br />analysis. The meeting would include the City of South Bend, the OWNER, and INDOT <br />LaPorte District. <br />• One (1) follow up meeting with INDOT to review the assumptions of the traffic study. <br />• One (1) meeting with City of South Bend, the OWNER to discuss revised <br />intersection alternatives <br />• One (1) meeting with INDOT to review comments and revised intersection <br />alternatives <br />• One (1) meeting with City of South Bend, the OWNER to discuss results of revised <br />traffic study <br />• Ong-(!) Two (2) meetings with IN DOT to review the results of the traffic study. <br />2024.00254 <br />
The URL can be used to link to this page
Your browser does not support the video tag.