My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 7 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 7 to PSA - Madison Lifestyle District Proj No 123-074 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 11:48:11 AM
Creation date
8/12/2025 11:47:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
8/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B161A24C-C99E-4417-A240-3BE587F7544E <br />Mr. Zach Hurst <br />July 28, 2025 <br />Page 3 <br />• Main Street & Marion Street/Site Driveway <br />• Main Street & Madison Street <br />• Michigan Street & Madison Street <br />• Madison Street & Site Driveway* <br />*Analysis volumes for the driveway will be determined based on trip generation, <br />distribution, and assignment. <br />Analysis Time Periods <br />• Typical Weekday, AM Peak Hour <br />• Typical Weekday, PM Peak Hour <br />Traffic Volume Scenarios <br />• Scenario 1: Opening Year (2026) Traffic (Background Growth Only) <br />• Scenario 2: Opening Year (2026) Traffic + Proposed Development Site Traffic <br />• Scenario 3: Horizon Year (2036) Traffic + Proposed Development Site Traffic <br />G. Intersection analysis will evaluate up to three (3) alternatives for the Main Street & Marion <br />Street/Site Driveway to determine how to handle pedestrians and entering/exiting traffic. <br />The interaction and queuing between the Michigan Street & Main Street/Marion Street <br />roundabout will also be taken into account. <br />• Improvements, such as turn lanes, access control, and intersection control will be <br />identified as part of this task. <br />• It is anticipated that the alternatives will require separate trip distribution and <br />assignment to accommodate the proposed alternatives. <br />H. Perform a turn lane warrant analysis based on Scenario 3 volumes per Indiana Design <br />Manual (IDM 2013) for the following study intersections: <br />• Main Street & Marion Street/Site Driveway <br />• Main Street & Madison Street <br />• Michigan Street & Madison Street <br />• Madison Street & Site Driveway <br />I. A traffic signal warrant analysis will be conducted to assess Warrant 1 (Eight -Hour <br />Vehicular Volume), Warrant 2 (Four -Hour Vehicular Volume), and Warrant 3 (Peak Hour <br />Vehicular Volume) based upon the Scenario 3 volumes for the following study intersection: <br />• Main Street & Marion Street/Site Driveway <br />2024.00254 <br />
The URL can be used to link to this page
Your browser does not support the video tag.