|
BID/PROPOSAL — ADDENDUM NO. 3
<br />CITY OF SOUTH BEND
<br />Project Name: Riverfront West Urban Neighborhood Infrastructure Improvements
<br />Project Number: 121-067
<br />For Bids Due: July 22, 2025
<br />Contractor Name: HRP Construction Inc.
<br />BASE BID
<br />Item
<br />No.
<br />Descri tion
<br />p
<br />Unit
<br />Estimated
<br />Quantity
<br />Unit Price
<br />Total Amount
<br />31
<br />SANITARY MANHOLE, 48", TYPE A
<br />EACH
<br />5
<br />13,000.00
<br />65,000.00
<br />32
<br />SANITARY MANHOLE, 60", TYPE B
<br />EACH
<br />4
<br />19,000.00
<br />76,000.00
<br />33
<br />SANITARY MANHOLE, 84", TYPE B
<br />EACH
<br />3
<br />33,000.00
<br />99,000.00
<br />34
<br />SANITARY MANHOLE, MODIFIED INDOT
<br />TYPE F
<br />EACH
<br />2
<br />60,000.00
<br />120,000.00
<br />35
<br />STORM MANHOLE, 48", TYPE A
<br />EACH
<br />12
<br />11,500.00
<br />138,000.00
<br />36
<br />STORM MANHOLE, 72", TYPE B
<br />EACH
<br />1
<br />18,000.00
<br />18 000.00
<br />37
<br />STORM MANHOLE, 84", TYPE B
<br />EACH
<br />10
<br />25,000.00
<br />250,000.00
<br />38
<br />STORM MANHOLE, 96", TYPE B
<br />EACH
<br />2
<br />45,000.00
<br />90,000.00
<br />39
<br />STORM MANHOLE,102", TYPE B
<br />EACH
<br />4
<br />55,000.00
<br />220,000.00
<br />40
<br />STORM MANHOLE,120", TYPE B
<br />EACH
<br />1
<br />69,000.00
<br />69,000.00
<br />41
<br />STORM MANHOLE, MODIFIED INDOT
<br />TYPE E
<br />EACH
<br />1
<br />90,000.00
<br />90,000.00
<br />42
<br />STORM INLET
<br />EACH
<br />24
<br />7,500.00
<br />180,000.00
<br />43
<br />MANHOLE, LINING
<br />VFT
<br />100
<br />442.00
<br />44,200.00
<br />44
<br />CONNECT TO EXISTING STRUCTURE,
<br />SANITARY
<br />EACH
<br />1
<br />9,500.00
<br />9,500.00
<br />45
<br />WATER MAIN, 12" DUCTILE IRON,
<br />POLYETHYLENE WRAPPED
<br />LFT
<br />1,99
<br />110.00
<br />219,670.00
<br />46
<br />WATER MAIN,12"x12" TEE
<br />EACH
<br />3
<br />1 4,675.00
<br />14,025.00
<br />47
<br />WATER MAIN, 12"45° BEND
<br />EACH
<br />26
<br />3,275.00
<br />85,150.00
<br />48
<br />WATER MAIN, 12" 22.5 ° BEND
<br />EACH
<br />6
<br />3,200.00
<br />19,200.00
<br />49
<br />1 WATER MAIN, 12" 11.25- BEND
<br />EACH
<br />7
<br />3,000.00
<br />21,000.00
<br />50
<br />WATER MAIN, 12" TAPPING SLEEVE
<br />WITH VALVE
<br />EACH
<br />3
<br />11,000.00
<br />33,000.00
<br />51
<br />WATER MAIN,12"X6" REDUCER
<br />EACH
<br />1
<br />2,250.00
<br />2,250.00
<br />52
<br />WATER MAIN, 12"X6" TEE-,---
<br />EACH
<br />4
<br />4,000.00
<br />16,000.00
<br />53
<br />WATER MAIN, 6" TAPPING SLEEVE WITH VALVE
<br />EACH
<br />1
<br />8,000.00
<br />8,000.00
<br />54
<br />HYD RANT ASSE M BLY WITH VALVE
<br />EACH
<br />4
<br />13,500.00
<br />54,000.00
<br />55
<br />WATER MAIN, 12" GATE VALVE
<br />EACH
<br />1 5
<br />7,000.00
<br />35,000.00
<br />56
<br />WATER MAIN, 12" INSERTION VALVE
<br />EACH
<br />2
<br />25,000.00
<br />50,000.00
<br />57
<br />WATER MAIN, 6" INSERTION VALVE
<br />EACH
<br />1
<br />12,000.00
<br />12,000.00
<br />58
<br />WATER SERVICES, 6" FOR 320 E
<br />JEFFERSON
<br />EACH
<br />2
<br />25,700.00
<br />51,400.00
<br />59
<br />WATER SERVICES, 3"
<br />EACH
<br />2
<br />12,200.00
<br />24,400.00
<br />Version 1/3/2025 Contractor's Bid for Public Works - 8 Addendum No. 3
<br />
|