Laserfiche WebLink
BID/PROPOSAL —ADDENDUM NO. 3 <br />CITY OF SOUTH BEND <br />Project Name: Riverfront West Urban Neighborhood Infrastructure Improvements <br />Project Number: <br />For Bids Due: <br />121-067 <br />July 22, 2025 <br />Contractor Name: HRP Construction Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />LS <br />1 <br />385,000-00 <br />385,000.00 <br />2 <br />MAINTAINING TRAFFIC <br />LS <br />1 <br />140,000.00 <br />140,000.00 <br />3 <br />1 EROSION AND SEDIMENT CONTROL <br />LS <br />1 <br />90,000.00 <br />90,000.00 <br />4 <br />CONCRETE, REMOVE <br />SYD <br />2,598 <br />6.00 <br />15,588.00 <br />5 <br />CURB AND GUTTER CONCRETE, <br />REMOVE <br />LFT <br />5,836 <br />3.00 <br />17,508.00 <br />6 <br />SIGN AND SUPPORTS, REMOVE <br />EACH <br />20 <br />100.00 <br />2,000.00 <br />7 <br />MANHOLE, REMOVE <br />EACH <br />0 <br />700.00 <br />13,300.00 <br />8 <br />INLET, REMOVE <br />EACH <br />E33 <br />200.00 <br />6,600.00 <br />9 <br />PIPE, WATER, REMOVE <br />LFT <br />W,527 <br />15.00 <br />37,905.00 <br />10 <br />PIPE, SANITARY, REMOVE <br />LFT <br />30.00 <br />52,950.00 <br />11 <br />PIPE, STORM, REMOVE <br />LFT <br />=3,906 <br />30.00 <br />117,180.00 <br />12 <br />FIRE HYDRANT ASSEMBLY, REMOVE <br />EACH <br />7 <br />1,000.00 <br />7,000.00 <br />13 <br />EXCAVATION, COMMON <br />CYD <br />18,920 <br />15.00 <br />283,800.00 <br />14 <br />B BORROW <br />CYD <br />10,830 <br />5.00 <br />54,150.00 <br />15 <br />STORMWATER PIPE, 60- RCP <br />LFT <br />552 <br />400.00 <br />220,800.00 <br />16 <br />STORMWATER PIPE, 54" RCP <br />LFT <br />133 <br />325.00 <br />43,225.00 <br />17 <br />STORMWATER PIPE, 48" <br />LFT <br />977 <br />240.00 <br />234,480.00 <br />18 <br />STORMWATER PIPE, 24" <br />LFT <br />32 <br />150.00 <br />4,800.00 <br />19 <br />STORMWATER PIPE, 18" <br />LFT­ <br />42 <br />130.00 <br />5,460.00 <br />20 <br />STORMWATER PIPE, 15" <br />LFT <br />100 <br />187.00 <br />18,700.00 <br />21 <br />STORMWATER PIPE, 15" WATER MAIN <br />GRADE PIPE <br />LFT <br />35 <br />267.00 <br />9,345.00 <br />22 <br />STORMWATER PIPE, 12" <br />LFT <br />401 <br />132.00 <br />53,460.00 <br />23 <br />STORMWATER PIPE, 12" WATER MAIN <br />GRADE PIPE <br />LFT <br />179.00 <br />18,079.00 <br />24 <br />SANITARY PIPE, 36" PVC <br />LFT <br />693 <br />494.00 <br />292,942.00 <br />25 <br />SANITARY PIPE, 36" WATER MAIN <br />GRADE PIPE <br />LFT <br />198 <br />581.00 <br />115,038.00 <br />26 <br />SANITARY PIPE, 24- PVC <br />LFT <br />0i <br />502.00 <br />85,842.00 <br />27 <br />SANITARY PIPE, 18" PVC <br />LFT <br />54 <br />306.00 <br />16,524.00 <br />28 <br />SANITARY PIPE, 12" PVC <br />LFT <br />10 <br />13,800.00 <br />29 <br />SANITARY PIPE, 101, PVC <br />—PIPE, <br />LFT <br />424 <br />.1,380.00 <br />94.00 <br />39,856.00 <br />30 <br />SANITARY 10" WATER MAIN <br />GRADE PIPE <br />LFT <br />351 1 <br />145.00 1 <br />50,895.00 <br />Version 113/2025 Contractor's Bid for Public Works - 7 Addendum No.3 <br />