Laserfiche WebLink
1316 COUNTY -CITY BUILDING <br />227 W. JEFFERsoN BOULEVARD <br />SOUTH BEND, INDIANA 46601-1830 <br />Date: July 18, 2025 <br />To: All Plan Holders <br />PHONE 574/ 235-9251 <br />FAX 574/ 235-9171 <br />TDD 574/ 235-5567 <br />CITY OF SOUTH BEND JAMES MUELLER, MAYOR <br />BOARD OF PUBLIC WORKS <br />Riverfront West Urban <br />Neighborhood Development <br />121-067 <br />Addendum No. 4 <br />From: Charlotte Brach, Project Manager <br />The items in this addendum are to become a part of the original documents as if included therein. <br />Only the noted items are affected, and the remainder of the original contract document is to <br />remain in its entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 — CLARIFICATIONS <br />PART 2 — INFORMATIONAL EXHIBIT <br />PART 1 — CLARIFICATIONS <br />1.01 Per City of South Bend Construction Standards, #8 stone is allowed for bedding of storm <br />and sanitary pipe. For water main bedding it is only specified that granular material be used, <br />therefore, #8 stone would be acceptable for bedding of water main pipe as well. <br />1.02 TR Flex will not be considered equivalent to the specified restrained joints for water main. <br />1.03 There are quantities in the contract for all items associated with the water taps. The <br />Contractor should plan for Water Works performing the wet taps. The Contractor will need <br />to coordinate with Water Works throughout construction. <br />1.04 Temporary paved access to the existing Crowe Building shall be made from Wayne Street <br />according to the exhibit attached to this addendum. The Contractor shall maintain access to <br />the parking lot nearest the building for Accessible parking spaces, as well as the parking lot <br />to the south of the building, with as many spaces kept available as possible. Additional <br />parking for Crowe employees during construction will be available at the Century Center <br />Riverfront West — Addendum No. 3 <br />