My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Riverfront West Urban Neighborhood Development Proj No 121-067 - C & E Excavating
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Riverfront West Urban Neighborhood Development Proj No 121-067 - C & E Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:34:50 AM
Creation date
7/23/2025 11:32:40 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Riverfront West Urban Development - Addendum #2 <br />PART 2 — SPECIAL PROVISIONS AND BID FORM <br />2.01 SPECIAL PROVISION, 13 "PROSECUTION AND PROGRESS", Item B.9 <br />1. REVISE to read "Contractor shall coordinate with the property owner at 320 East Jefferson <br />Boulevard (Crowe LLP) and 424 South Michigan Street (United States Post Office) regarding <br />disruptions to their parking lots during construction. Access to the parking lot shall be <br />maintained at all times during construction. Disruptions shall be kept to a minimum. <br />2.02 SPECIAL PROVISION, 19 "UTILITY COORDINATION", Item B.3 <br />1. REVISE to read "An Irrigation Allowance is provided in the bid proposal for sprinkler <br />repairs at a fixed amount of $25,000. The Contractor will be paid out of this allowance <br />for any private irrigation work repair order by the City. The Contractor must provide the <br />City invoices for this work. No Contractor markup is allowed. Restoration of sprinkler <br />systems damaged by the Contractor's operations exceeding the allowance will be <br />considered incidental to the contract." <br />2.03 SPECIAL PROVISION, 20 "MAINTENANCE OF TRAFFIC" <br />ADD item B.12 to read "The contractor shall notify all affected businesses of any <br />changes to traffic patterns or maintenance of traffic at least three (3) business days prior <br />to any changes." <br />2.04 SPECIAL PROVISION, 25 "M/WBE GOALS", Item B.I.a. <br />1. REVISE to read MBE —1.76% <br />2.05 SPECIAL PROVISION, 32. "STRUCTURE REMOVAL, FIRE HYDRANT REMOVAL, <br />PIPE REMOVAL, AND PIPE ABANDONMENT" Item B.2.8 <br />1. REVISE to read "All work and equipment required to cut and cap existing water mains as <br />shown on the plans will not be paid for separately but shall be included in the cost of the <br />pipe removal. Removal of valves shall be included in the cost of the pipe removal." <br />2.06 ADD SPECIAL PROVISION as follows: <br />81. AMA FOR TEMPORARY PAVEMENT TYPE A <br />A. Prevailing Specifications: 2024, INDOT Standard Specifications Section 402 <br />B. Additions <br />1. Temporary Pavement shall be installed to provide access to the parking areas <br />utilized by employees and customers of Crowe, LLC at 320 East Jefferson <br />Boulevard. <br />2. Temporary HMA paving areas are not noted on the plans. This is an <br />undistributed quantity to be use as -needed. <br />3. Payment for HMA for Temporary Pavement, Type A will be paid at the unit <br />price as set forth in the Proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.