My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Riverfront West Urban Neighborhood Development Proj No 121-067 - C & E Excavating
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Riverfront West Urban Neighborhood Development Proj No 121-067 - C & E Excavating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:34:50 AM
Creation date
7/23/2025 11:32:40 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1316 COUNTY -CITY BUILDING <br />227 W.JEFFERSON BOULEVARD <br />SOUTH BEND, INDIANA 46601-1830 <br />Date: July 11, 2025 <br />To: All Plan Holders <br />iverfront West Urban Development - Addendum #2 <br />PHONE 574/ 235-9251 <br />FAX 574/ 235-9171 <br />TDD 574/ 235-5567 <br />CITY OF SOUTH BEND JAMES MUELLER, MAYOR <br />BOARD OF PUBLIC WORKS <br />Riverfront West Urban <br />Neighborhood Development <br />121-067 <br />Addendum No. 2 <br />From: Charlotte Brach, Project Manager <br />The items in this addendum are to become a part of the original documents as if included therein. <br />Only the noted items are affected, and the remainder of the original contract document is to <br />remain in its entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 — CLARIFICATIONS <br />PART 2 — SPECIAL PROVISIONS AND BID FORM <br />PART 3 — CONSTRUCTION DOCUMENTS <br />PART I — CLARIFICATIONS <br />1.01 Please see the attached Pre -Bid Meeting Minutes and sign in sheet. <br />1.02 A list of current contractor questions is attached, including answers where available. <br />Questions requiring clarification or changes to the bidding documents will be answered by <br />addendum prior to the bid due date. <br />1.03 Developer's construction schedule is provided. Please note this schedule is preliminary in <br />nature and subject to change. <br />1.04 Developer plans showing proposed building locations are attached for reference. <br />1.05 Utility work plans are attached for reference. These plans are provided for reference only <br />and have not been reviewed or approved by the relevant authorities. These plans are <br />preliminary in nature and are subject to revision. Final alignment, details, and installation <br />requirements for utility infrastructure, including but not limited to conduit alignments and <br />hand hole/vault locations, shall be confirmed and approved during the final design and <br />permitting process. All contractors and stakeholders should coordinate closely with the <br />design team and applicable utility entities prior to commencing any related work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.