My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:27:21 AM
Creation date
7/23/2025 11:25:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
# Services <br />10% Profit: $2,790.00 <br />Total: $30,690.00 <br />4 Back Bay East <br />Qty Price Total <br />1.00 $47,900.00 $47,900.00 <br />Scope of Work: <br />Remove existing roof system in its entirety <br />Install two layers of 2.5" ISO board to achieve R-30+ insulation value <br />Build up custom tapered insulation system with ridge running east -west to direct water to scupper boxes <br />Custom X/Y board layout with 2" ISO layers on each slope <br />Final high point approx. 4" above R-30 base <br />Fully adhered TPO membrane installation over new insulation system <br />Install all necessary metal flashing, edge metal, and terminations <br />Fabricate and install 4 new scupper boxes with collector boxes and downspouts (RAMCO color -matched — <br />sample to be submitted) <br />Supply and install 200 linear feet of special -order clay coping (Camelback 13") — field verify on -site <br />Cost Breakdown: <br />Back Bay Roofing System (TPO + ISO + Labor): 1,500 sq. ft. @ $18.00/sq <br />Scupper boxes w/ downspouts (4 total): $1,500.00 each = $6,000.00 <br />Clay coping — materials (200 LF): $4,500.00 <br />Clay coping — labor: $1,500.00 <br />Masonry integration repairs (roof -only tie-in): $5,000.00 <br />Subtotal: $44,000.00 <br />10% Profit: $4,000.00 <br />Total: $47,900.00 <br />Accepted payment methods <br />Credit Card, Check, Cash, ACH Bank Transfer, PayPal <br />Message <br />I would be happy to have an opportunity to work with you. <br />ft. _ $27,000.00 <br />Subtotal $125,510.00 <br />Grand Total ($) $125,510.00 <br />For projects over $20,000, a draw schedule will be in place of a 50% due upon acceptance of estimate and prior to <br />scheduling of work, 25% due on the day work begins, and the balance of the contract due the day of project <br />completion unless otherwise agreed upon in writing by project consultant and customer. <br />Terms <br />1) Financing: Financing up to $50,000 is available for all residential projects and provides multiple term options for <br />customers. Monthly payments are approximated without review of customer credit and may be subject to change <br />following a soft credit pull from the outside lender. Financing is approximated to be approved for all consumers with a <br />minimum credit score of 500. <br />2) Scope of Work: Company will provide services as described in the attached estimate. The company will provide all <br />services, materials, labor, tools, and equipment needed for completion of services unless requested from customer to <br />use specific materials purchased by the customer. <br />3) Payment Terms: For projects over $20,000, a draw schedule will be in place of a 50% due upon acceptance of <br />estimate and prior to scheduling of work, 25% due on the day work begins, and the balance of the contract due the <br />
The URL can be used to link to this page
Your browser does not support the video tag.