My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Bids
>
Opening of Bids - Milkweed Commons Roof Replacements Proj No 125-021B - Reliable Roofing and Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 11:27:21 AM
Creation date
7/23/2025 11:25:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`� R � <br />� 2 <br />G <br />� n <br />d� <br />ri 1// <br />��Wx^s <br />�4. 302.7 g'- <br />FROM: <br />Reliable Roofing & Construction <br />License: 5148-23 <br />EIN # 93-4655473 <br />2048 East Ireland Road, Suite A <br />South Bend, IN, 46614 <br />Email: Maddy@reliableroofingonline.com <br />Phone: (574) 302-7977 <br />TO: <br />Herstoric Development <br />Attn: Rachel <br />516 South Michigan Street <br />South Bend, IN, 46601 <br />JOB: <br />The Monarch <br /># Services <br />1 Dumpster (10yd) <br />ESTIMATE <br /># EST-005204 <br />Estimate Date: Jul 18, 2025 <br />Expiry Date: Aug 15, 2025 <br />JOB LOCATION: <br />Herstoric Development <br />516 South Michigan Street <br />South Bend, IN, 46601 <br />For waste, and debris disposal on project site. included gravel <br />2 Event Room Structural Deck Demolition & Reconstruction <br />Qty Price Total <br />4.00 $580.00 $2,320.00 <br />1.00 $44,600.00 $44,600.00 <br />1. Demolition of Existing Roof Deck — $5,800 <br />Complete removal and disposal of existing metal decking and concrete slab above the event room area. Includes <br />setup, cutting, and debris handling per Indiana demolition code and OSHA compliance. <br />Additional cost includes handling due to site conditions and safety prep. <br />2. Installation of New Galvanized B-Deck and Concrete Topping — $11,200 <br />Install 20 GA x 1.5" galvanized G60 B-deck, fully welded to structure. <br />Pour 2" concrete topping slab with reinforced welded wire mesh (WWM). <br />Concrete and deck installed per structural detail. <br />Includes edge protection, setup, and fasteners. <br />3. Material Cost — Galvanized B-Deck — $4,500 <br />Includes supply, delivery, and staging of galvanized B-deck. G60 coating ensures durability and corrosion <br />resistance. <br />4. Temporary Shoring & Wall Bracing During Deck Work — $5,500 <br />Due to deterioration in surrounding CMU/masonry, temporary shoring will be installed to maintain lateral stability <br />
The URL can be used to link to this page
Your browser does not support the video tag.