My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07082025 Board of Public Works Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2025
>
07082025 Board of Public Works Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 4:15:52 PM
Creation date
7/22/2025 4:15:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/22/2025
Text box
ID:
1
Creator:
Created:
7/22/2025 4:15 PM
Modified:
7/22/2025 4:15 PM
Text:
mailto:epilipow@milestonelp.com
ID:
2
Creator:
Created:
7/22/2025 4:15 PM
Modified:
7/22/2025 4:15 PM
Text:
mailto:sales@moveoveroutfitters.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING JULY 8, 2025 142 <br />REGULAR MEETING JULY 8, 2025 <br />The Regular Meeting of the Board of Public Works was convened at 9:31 a.m. on Tuesday, July <br />8, 2025, by Board President Elizabeth A. Maradik in the 13" Floor Conference Room of the <br />County -City Building, 227 W. Jefferson Blvd., South Bend, Indiana. The meeting was also <br />streamed live to the public via Microsoft Teams. Board Clerk Hillary Horvath confirmed the <br />presence of Board President Elizabeth A. Maradik, Vice President Joseph Molnar, and Board <br />Members Gary Gilot, Murray Miller, Breana Micou, and Board Attorney Michael Schmidt, with <br />a roll call. President Maradik reminded virtual attendees to mute their microphones and turn off <br />their cameras when not speaking and to save their questions and comments for the Privilege of the <br />Floor. <br />APPROVE MINUTES OF PREVIOUS MEETING <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the minutes <br />for the Regular Meeting of the Board held on June 24, 2025, were approved. <br />OPENING OF BIDS — 2025 CONTRACTOR PAVING ROUND 2 — PROJECT NO. 125-034 <br />(PR-00040888) <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following bids were opened and publicly read: <br />MILESTONE CONTRACTORS, L.P. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />oilipowgmilestonelp.com; akrueger a,milestonelp.com <br />Bid was submitted by Mr. Dustin P. Hilary <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum Acknowledgements were received. <br />BID: <br />Base Bid Total $2,278,000 <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />ralvaradogrieth-riley.com; gvanparysgrieth-riley.com <br />Bid was submitted by Mr. Ruben Alvarado <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />Three (3) Forms MWBE-1.0, 2.0, 2.1 were completed. <br />One (1) of One (1) Addendum Acknowledgements were received. <br />BID: <br />Base Bid Total $2,196,392.10 <br />Upon a motion made by VP Molnar, seconded by Mr. Miller and carried by roll call, the above <br />bids were referred to Engineering for review and recommendation. <br />OPENING OF BIDS — POLICE DEPARTMENT UPFIT EQUIPMENT—(PR-00041071) <br />This was the date set for receiving and opening sealed bids for the above referenced project. The <br />Clerk tendered proof of publication of the Notice in the South Bend Tribune, which was found to <br />be sufficient. The following Bid was opened and publicly read: <br />MOVE OVER OUTFITTERS INC. <br />3546 Brady Lane <br />Lafayette, IN 47909 <br />sales(amoveoveroutfitters.com: kent(a.moveoveroutfitters.com <br />Bid Bond Submitted By Mr. Kent Wainscott <br />Non -Collusion, Non -Discrimination Affidavit Form was NOT submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.