My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1414 East Wayne Street_COA 2025-0703
sbend
>
Public
>
Historic Preservation
>
2025
>
July
>
Commission Approvals
>
1414 East Wayne Street_COA 2025-0703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 3:50:18 PM
Creation date
7/22/2025 3:48:17 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1414 East Wayne Street
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />O w n e r ’ s I n i t i a l s _________ <br />P a g e | 2 <br />Main Level Interior <br /> Remove door and casing to half bathroom <br /> Remove wall section to make a wider bathroom door opening <br /> Remove flooring and base trims in half bathroom, kitchen and down <br />hallway; stopping at transitions to original ¾” flooring <br /> Remove subfloor to joists in half bath for access to plumbing and <br />HVAC crawlspace <br /> Remove toilet and pedestal sink in half bath <br /> Remove all wallpaper in project area only (kitchen, half bath, hallway) <br /> Remove all accessories in half bath <br /> Remove lighting throughout kitchen, hallway and half bath <br /> Remove portions of plaster ceiling for new lighting layout in kitchen <br /> Remove windows and trims at existing breakfast nook; preserve <br />windows for reinstallation at new breakfast nook location <br /> Remove built-in seating and table in kitchen <br /> Remove all kitchen cabinets and countertops <br /> Remove (4) cabinet doors in hallway; leaving cabinet box in place <br /> Remove kitchen sink and faucet <br /> Remove backsplash tile in kitchen <br /> Remove appliances; preserve all appliances for reinstallation <br /> <br />2nd Floor Hall Bathroom <br /> Remove toilet <br /> Remove sink and faucet <br /> Remove vanity cabinets and countertop <br /> Remove shower/tub wall surround, plumbing fixtures, bathtub and <br />curtain rod <br /> Remove floor tile to the subfloor and base trims <br /> Remove mirror and all other accessories <br /> Remove vanity light and soffit <br />o Soffit above bathtub and toilet to remain <br /> Remove flushmount light and vent <br /> Remove wall cabinet above toilet <br /> Remove all wallpaper <br /> Remove any damaged piping if needed at vanity as well as bathtub <br /> <br />See excavation list for additional items. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.