Laserfiche WebLink
2. Provide up to 2 hard copy sets of final documents (half-size) and up to 2 hard copy sets of <br />final documents (full-size 2406). <br />a. Owner to submit to regulatory agencies for approval. <br />3. Meet with Owner and State of Indiana regulatory agencies in person or virtually to discuss <br />review comments. <br />4. Nominal comments from the regulatory agencies will be addressed via response letter and <br />may include a few updated drawings sheets, effort for which is included. Should the <br />regulatory agencies require multiple rounds of submittals or extensive changes to the <br />documents, this would be considered Supplemental Services. <br />Task 404 — 100% Detailed Design <br />1. Revise documents with final Owner and regulatory agency comments. This is the Bid Set. <br />2. Front end documents shall be finalized at this milestone as shown in Task 501. <br />Task 405 — Opinion of Probable Construction Cost (50%, and 100% Milestones) <br />1. The Engineer will prepare Engineer's Opinions of Probable Construction Costs for at 50% <br />design (RACE Level 3) and 100% design (RACE Level 1) deliverables. <br />TASK 500 — BID AND PRE -AWARD SERVICES <br />Task 501 — Advertisement <br />1. Front End Documents. Assist and advise Owner to finalize front end documents and <br />identify: <br />a. Project advertisement date <br />b. Date to receive bids <br />c. Format of bid sets <br />d. Concerns about sensitivity of documents and methods of distribution <br />e. Method of document reproduction and distribution of bid sets <br />f. Number of bid sets to be reproduced <br />g. Amount to be charged for bid sets <br />h. Refundable amount (if any) <br />i. Method of advertisement <br />Page 8 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />