Laserfiche WebLink
Docusign Envelope ID: D6C53305-7513-4331-95AB-7279605F17A9 <br />3.0 TASK 3: 50% Design <br />3.1 Well Pump Design Calculations: Perform hydraulic calculations for each well site. <br />3.2 50% Drawings: Prepare 50% design drawings. See below draft listing of sheets. <br />Sheet <br />Well Replacement Plans <br /># of sheets <br />1 <br />Trie Shee' <br />1 <br />2 <br />Drawing Index <br />1 <br />3 <br />General Location Map <br />1 <br />4 <br />General Ah4reviationG. S mh ilc.. er ehds, and Not9F <br />1 <br />5 <br />Survey Control <br />1 <br />6-9 <br />IErosiGrk (;ontrol and Demolition Plan <br />10-11 <br />Site Improvement,.; <br />2 <br />12-13 <br />New Well Constriction Delails <br />2 <br />14-15 <br />New Buildings ! Well Piping Plan and Section Vlews <br />2 <br />16 <br />Mechanical Legends and Schedules <br />1 <br />11-18 <br />Pinhook)Cleveland New Well Building Mechanical Pla^s <br />2 <br />19 <br />IMechanical Details <br />1 <br />20 <br />Plumbing Plan (both sites) <br />1 <br />21 <br />Elecincal Legends and Schedules <br />I <br />22 <br />Pinhook Oneline and Riser Diagrams <br />1 <br />23 <br />Cleveland Road Oneline and Riser Diagrams <br />1 <br />24 <br />Pinhook Electrical Site Demo Plan <br />1 <br />25 <br />Pinhook Electrical Sile Improvemenis Plan <br />1 <br />26 <br />Pinhook Well Building Power Plan <br />1 <br />27 <br />Pinhook Well Building Lighfing Plan <br />1 <br />28 <br />Cleveland Road Electrical Site Demo Plan <br />1 <br />29 <br />Cleveland Road Electrical Site Irnprovernents Plan <br />I <br />30 <br />Cleveland Road Well Budding Power PIN- <br />I <br />31-32 <br />Electrical Details <br />r <br />33-35 <br />lMiWellEineOUS Details <br />36 <br />General Structural Notes <br />37 <br />well Building 1 - Foundation & Rool'Framing Pla• <br />I <br />3y <br />well Building 2 - Foundation & Roof Framing P 3- <br />1 <br />39 <br />Foundalion Sections & entails <br />1 <br />40 <br />Masonry Sections 8 Details' <br />1 <br />411.1 <br />TOTAL <br />141 <br />'Eliminale these sheels it opt for wood post irarne buildings <br />3.3 50% Contract Book: Prepare 50% contract book, which includes technical <br />specifications. <br />3.4 50% Bid Form and Cost Estimate: Prepare a bid form and 50% design cost estimate. <br />3.5 50% Submittal Assembly: Submit the following to CITY: <br />• 50% Full -Size 22"x34" and Half Size 11"x17" Drawings <br />(PDF and 1 full-size and 4 half-size hard copies) <br />• 50% Bid Form and Cost Estimate (PDF and 4 hard copies) <br />In the Agreement, Task 3 is included in Preliminary Design phase. <br />4.0 TASK 4: 90% Design <br />4.1 Surveying Field Work: Site survey will include full topographic survey in support of the <br />proposed improvements. Tie proposed project layout into existing coordinate systems <br />and vertical monuments. This survey, together with existing record drawings will be <br />6/30/2025 Commonwealth Engineers Inc. <br />