My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Well replacments Cleveland and Pinhook Proj No 125-033 - Commonwealth
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Well replacments Cleveland and Pinhook Proj No 125-033 - Commonwealth
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:58:16 PM
Creation date
7/22/2025 2:56:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: D6C53305-7513-4331-95AB-7279605F17A9 <br />The project consists of the following: <br />• Cleveland South: The new well location will be identified and reviewed with the CITY prior <br />to completing the new well site survey permitting process. Test drilling, test well <br />development, and well sampling for IDEM water quality parameters will be conducted near <br />the proposed new well location. Concurrently with well site survey and testing, design will <br />be conducted for a new well, well house (masonry with brick veneers), raw water site <br />piping, and decommissioning of the old well. A mandatory deductive alternate will be <br />included in the bid for eliminating the new well building. <br />• Pinhook: The scope for this site is the same as Cleveland South, but at this location, a <br />study will also be conducted to suggest locations for Wells 1, 2, and 4. <br />SCOPE OF SERVICES: <br />1.0 TASK 1: Meetings, Project Management and Quality Assurance / Quality Control <br />1.1 Kickoff Meeting: Prepare for and hold kickoff meeting with the CITY to confirm scope, <br />work plan, lines of communication, and schedule. Prepare and distribute meeting <br />notes. <br />1.2 50% Design Meeting: Prepare for and conduct the 50% Design Meeting with the CITY. <br />Prepare and distribute meeting notes. Perform a field verification review after the 50% <br />submittal to make sure field items are properly shown on the drawings. <br />1.3 90% Design Meeting: Prepare for and conduct the 90% Design Meeting with the CITY. <br />Prepare and distribute meeting notes. Perform a field verification review after the 90% <br />submittal to make sure field items are properly shown on the drawings or included in <br />the specifications. <br />1.4 Proiect Management: Project management including general correspondence, general <br />coordination with the design / field work / subconsultant team, invoicing, scheduling, <br />and budget maintenance. <br />1.5 50% Submittal QA/QC: Perform QA/QC on 50% submittal. <br />1.6 90% Submittal QA/QC: Perform QA/QC on 90% submittal. <br />1.7 Final Submittal QA/QC: Perform QA/QC on Final submittal. <br />In the Agreement, Task 1 is split equally between Preliminary Design and Final Design <br />phases. <br />2.0 TASK 2: Well Hydrogeological Design and Permitting Coordination <br />The CITY will contract with Peerless Midwest to perform Well Hydrogeological Design and <br />Permitting. The ENGINEER will coordinate with Peerless Midwest to obtain the location of the <br />new wells, IDEM approval for new well site, report from testing drilling and water quality <br />analysis, Pinhook Well Relocation Plan, and IDEM Construction Permit Attachment B. In the <br />Agreement, Task 2 is included in Additional Services. <br />6/30/2025 Commonwealth Engineers Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.