My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
GESC for Olive WTP Solar Proj No 124-050 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:56:29 PM
Creation date
7/22/2025 2:55:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Date
7/22/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table G2: ECM 1: Solar PV <br />Category. <br />• <br />Conservation <br />Ground Mount Solar PV system <br />Measure <br />M&V Plan <br />Option B (all parameter measurement) will be used to quantify the energy savings <br />Description <br />associated with the Solar Photovoltaic system. <br />Baseline <br />The Solar PV system has been modeled utilizing software to determine the expected <br />Performance <br />production for the project location based on system design characteristics and <br />Parameters <br />historical average solar availability. <br />Post Installation <br />The new Solar PV system will be monitored during start-up / commissioning to <br />Performance <br />confirm that the system is operating properly, and that the overall system is operating <br />Parameters <br />as intended. <br />The post installation performance parameters include the following parameters: <br />• Total system kWh production <br />• Site Insolation solar availability <br />• System availability <br />These parameters will be monitored using 15-minute interval data from the installed <br />Data Acquisition System after installation is completed to verify the installed system <br />is producing electricity consistent with the modeled expected output values including <br />the expected 0.5% annual degradation of PV panel production. If actual production <br />exceeds the guaranteed production, no adjustments will be made. If actual <br />production is less than the guaranteed production, monthly adjustments may be <br />made to account for less than expected insolation, system outages, or other factors <br />that are not within the control of Ameresco. A regression model will be built using <br />actual performance data to show the production achieved for a given unit of solar <br />availability (insolation). This regression will be used to determine the impact of any <br />equipment downtime, and it will also be used to determine any potential adjustments <br />for insolation lower than the monthly average for the site. <br />Performance <br />Confirm that the system produces the expected annual kWh output as adjusted as <br />Assurance <br />described above. Analysis will be performed using values extracted from the DAS <br />Activities <br />and reported annually during the M&V term. <br />Assurance <br />Ameresco <br />Activities <br />Performed By <br />Customer <br />Provide all required maintenance and ensure system is allowed to operate <br />Responsibilities <br />Performance <br />The year beginning the first day of the month following Delivery and Acceptance. If <br />Period <br />additional years of M&V are paid for, the performance period will be each <br />subsequent year beginning on the first day of the month following the anniversary <br />Delivery and Acceptance. <br />Confidential & Proprietary Information of Ameresco, Inc. Page 34 of 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.