Laserfiche WebLink
City of South Bend Project No. 122-040A 6/10/2025 <br />DTSB to ND Trail (Notre Dame Ave) <br />Line Item Qty Unit Price Total <br />Add Bollards - ND/SB x2, ND/Howard x2, ND/Angela x1, ND/Corby x2 10 EA $1,722.00 $17,220.00 <br />Powder Coated Stop Sign Poles 209 LF $24.58 $5,137.22 <br />Hydrant Flow Test 4 EA $205.00 $820.00 <br />Installation of Trail Counter 1 LS $5,804.70 $5,804.70 <br />MLK/LaSalle Wayfinding Foundation Correctoin 1 LS $9,758.00 $9,758.00 <br />CO Total =$38,739.92 <br />Change Order #2 <br />Notes <br />5 for stock <br />Four Hydrants Tested