My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 2 - ND-DTSB Trail Proj No 122-040A - Milestone Contractors LP
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 2 - ND-DTSB Trail Proj No 122-040A - Milestone Contractors LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 1:17:39 PM
Creation date
7/8/2025 1:17:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 122-040A 6/10/2025 <br />DTSB to ND Trail (Notre Dame Ave) <br />Line Item Qty Unit Price Total <br />Add Bollards - ND/SB x2, ND/Howard x2, ND/Angela x1, ND/Corby x2 10 EA $1,722.00 $17,220.00 <br />Powder Coated Stop Sign Poles 209 LF $24.58 $5,137.22 <br />Hydrant Flow Test 4 EA $205.00 $820.00 <br />Installation of Trail Counter 1 LS $5,804.70 $5,804.70 <br />MLK/LaSalle Wayfinding Foundation Correctoin 1 LS $9,758.00 $9,758.00 <br />CO Total =$38,739.92 <br />Change Order #2 <br />Notes <br />5 for stock <br />Four Hydrants Tested
The URL can be used to link to this page
Your browser does not support the video tag.