Laserfiche WebLink
Alternate 1: Block Wall Storaae Corral <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Concrete Block Wall: Bidder shall provide <br />6 <br />price to provide and install "Concrete <br />1 <br />LS <br />//-- 430 <br />Ip�(9S <br />$ ad <br />2— 6o S <br />Block" walls 6'x2'x2' Block). <br />Total Amount for Alt. 2 Quote <br />$ I Z&,5- <br />Alternate 2: Raised Beds <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Wolmanized Wood (Raised Beds): Bidder <br />o <br />shall provide price to provide and install <br />Wolmanized wood raised beds, including all <br />00 <br />//�� <br />7 <br />1 <br />LS <br />3��W� <br />$ <br />associated framing, fasteners, filter fabric, <br />)= <br />and structural support as identified in the <br />tans. 5 Beds — 4'xl D'x10" <br />8 <br />Pea Gravel (Raised Beds) <br />15 <br />TON <br />3 <br />a Y `7 r <br />Total Amount for Alt. 3 Quote <br />$ S�{C,i b O <br />Alternate 3: Geotextile Fabric <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Geotextile Fabric, Staging Areas: Bidder <br />9 <br />shall provide price to provide and install <br />10,070 <br />SF <br />$ <br />geotextile fabric at staging areas as <br />identified in the plans. <br />Geotextile Fabric, Growing Rows: Bidder <br />10 <br />shall provide price to provide and install <br />45,600 <br />SF <br />$ U <br />geotextile fabric at growing row as identified <br />in the plans. <br />Total Amount for Alt. 4 Quote <br />S <br />Alternate 4: Pavilion <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />11 <br />Pavilion, Monoslope 20'x30' <br />1 <br />EA <br />$ <br />Total Amount for Alt. 5 Quote <br />$ 6 ° <br />Alternate 5: Tree Placement <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Tree Placement — Transport of 100 nursery <br />12 <br />trees from Elbel Nursery, repotting, and <br />1 <br />LS <br />/ g n�/ oo <br />$ <br />placinginto Grow Rows. <br />O <br />C7 (s� <br />Total Amount for Alt. 6 Quote <br />$ 8 <br />