My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Tree Nursery ReQuote Proj No 125-017R - Acorn Landscaping
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Quotes - Tree Nursery ReQuote Proj No 125-017R - Acorn Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 1:28:30 PM
Creation date
7/8/2025 1:14:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'ot fllbE <br />QUOTEIPROPOSAL <br />CITY OF SOUTH BEND <br />f NAS <br />PROJECT NAME Urban Tree Nursery Site Improvements <br />PROJECT NO. 125-017R <br />QUOTES DUE Tuesday, July 8, 2025 at 9:30am <br />Base Bid Items: Utility Connections and Grading Work <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization ! Demobilization <br />1 <br />LS <br />$ <br />2 <br />Excavation / Grading (Pavilion, Staging <br />1 <br />LS <br />ao2 <br />$ g0 ZOZ <br />Areas and Includes tillin Grow Rows <br />3 <br />Concrete, 4" (Under Pavilion) <br />93 <br />Sys <br />75, <br />$ MIS 0 <br />F�7Pavilion <br />#53 Compacted Aggregate (Under <br />210 <br />TON <br />//�o� <br />S- <br />$ // o <br />3(v5� <br />and Staging Areas —10 900SF <br />lS� <br />ALLOWANCE #1: Irrigation Hook -Up <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Allowance 1: Connect to existing 2" <br />irrigation main at the Half Moon site, <br />including a new controller. Water <br />connections and controls to be located at <br />the Northeast corner of the site. <br />5 <br />Bidder shall provide price to provide and <br />1 <br />LS <br />$25.000 <br />install PVC Water Lines from Irrigation <br />Main to Growing Rows. <br />Bidder shall provide price to provide and <br />install Drip Irrigation Hoses from PVC <br />Connections at Growing Rows <br />ALLOWANCE #1 TOTAL $25,000 <br />BASE BID TOTAL j3q _Q:V_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.