Laserfiche WebLink
HRP Construction, Inc. provided an MBE Utilization Plan with 1.62% participation and a WBE <br />Utilization Plan with 4.54% participation, in total approximately $76,000 of their Base Bid price. <br />C&E Excavating's price was $78,326.00 lower than Selge Construction Company's Base Bid <br />price and $295,821.70 lower than HRP Construction's Base Bid price. <br />Bid Recommendation: <br />Public Works, the Division of Engineering, and Division of Water Works recommend the award <br />of Protect No. 117-059A South Well Field, Water Treatment Plant, and Distribution System <br />Improvements — Bid Package 2, Division B to C&E Excavating, Inc. for the Base Bid amount of <br />$936,674.00. <br />If the Board of Public Works accepts and grants a Good Faith Waiver for this project through <br />the acceptance of C&E Excavating's bid submittal, the award of Bid Package 2 Division A <br />(separate bid award) and Division B both present the most economical construction project in <br />comparison to the Base Bid submittal received for Bid Package #1. The lowest bidder <br />maintains an opportunity to secure additional MBE and WBE subcontractors to try to improve <br />on the MBE and WBE Utilization Goals. <br />This project is funded out of the Southside TIF and Water Capital Fund. <br />For questions regarding the subject Agenda Request or project scope of work, contact <br />Jacob M. Klosinski (Ext. 9496) at the Division of Engineering. <br />