My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11211-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
2025
>
11211-25 Amending Articles 1 Through 7 and Article 11 of Chapter 6 of the South Bend Municipal Code to Update Regulations Governing the Building Department
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 3:59:30 PM
Creation date
7/1/2025 3:59:21 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) In the event that the registration holder leaves the employment of a business firm, <br /> company, or corporation, that business firm, company, or corporation shall have thirty <br /> (30) days to secure another registration holder. A new registration shall be issued in <br /> accordance with the provisions set forth in Section 6-36.2. <br /> (2) In the event of a death of the registration holder, the business firm, company, or <br /> corporation shall have six (6)months to secure another registration holder. A new <br /> registration shall be issued in accordance with the provisions set forth in Section 6- <br /> 36.2. <br /> (Ord. No. 8243-92, § 1; Ord. No. 8566-94, § 3; Ord. No. 8931-98, § 6; Ord. No. 9126-00, §§ 8, <br /> 9; Ord. No. 9528-04, § 10; Ord. No. 9902-09, § VIII, 2-9-09; Ord. No. 10394-15, § IX, 10- <br /> 26-15) <br /> Sec. 6-36.3. Permits. <br /> (a) Required in advance. No person shall perform or cause to be performed the installation of <br /> heating, ventilating, air conditioning or refrigeration equipment or systems without <br /> obtaining, in advance, a permit from the Department. <br /> (b) Where a person shall unlawfully proceed to do any work or installation without a permit as <br /> required herein, the applicable permit fee shall be tripled as a penalty. The payment of such <br /> penalty shall not release the person in default from any other penalties provided herein, nor <br /> from compliance with any relevant provisions of the Municipal Code. <br /> (c) Fees. Each application for a permit for installation of heating, ventilating, air conditioning, <br /> and refrigeration equipment or systems shall be accompanied by fees in accordance with the <br /> schedule below, with a minimum permit fee being sixty dollars ($60.00). When the total <br /> capacity of any system in any single installation is provided by more than one(1) unit, the <br /> sum of the capacities of each unit and the total number of such units shall determine the fee. <br /> (1) Heating units: $60.00 <br /> (2) Air Conditioning, Central, Electric: <br /> a. Less than 10 tons 60.00 <br /> b. Over 10 tons 70.00 <br /> c. Water chillers 85.00 <br /> d. EMI-air blower 60.00 <br /> (3) Ventilating and exhaust systems: <br /> a. Less than 500 CFM capacity 6.00 <br /> b. 500 to 1,500 CFM capacity 12.00 <br /> c. Greater than 1,500 CFM capacity 20.00 <br /> (4) Ventilating commercial hoods; including make up air: 120.00 <br /> (5) Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> a. Up to 10 horsepower, each 60.00 <br /> b. More than 10 horsepower, each 75.00 <br /> (6) Rooftop combination <br /> a. Up to 7'/2 tons 60.00 <br /> b. 7% tons or more 75.00 <br /> (7) Heat pumps: <br /> a. Up to 7%2 tons, each 75.00 <br /> b. 7'h tons or more, each 85.00 <br /> c. Earth, coupled water source 60.00 <br /> (8) Mini-split Unit 60.00 <br /> a. Each Head 20.00 <br /> (9) Boilers, steam or hot water: <br /> a. Up to 300,000 Btu 60.00 <br /> b. 300,000 Btu or more 70.00 <br /> (10) Combination air conditioning/heating: <br /> a. VAV Boxes w/Coil 60.00 <br /> b. P-Tac, per Unit 60.00 <br /> (11) Air handlers 70.00 <br /> (12) Duct and register: <br /> a. Up to 30 openings 60.00 <br /> b. 31-100 openings 80.00 <br /> c. Over 100 openings 100.00 <br /> (13) Backup generators—Gas line: 60.00 <br /> (14) Gas reconnection, each 60.00 <br /> Page 28 of 3 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.