My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Madison Trail Connector - Abonmarche Consultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Madison Trail Connector - Abonmarche Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 12:02:22 PM
Creation date
6/10/2025 12:01:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />315 West Jefferson Boulevard, South Bend, IN 46601 • 574.232.8700 <br /> <br />abonmarche.com <br />Engineering • Architecture • Land Surveying <br /> <br /> <br />Scope of Services <br /> <br />Madison Street Trail Connector <br /> <br />The primary purpose of the project is to prepare plans, specifications, and bid documents for a <br />bicycle trail from the East Bank Trail to the Link Trail at Hill Street. <br /> <br />A. Topographic Survey <br />1. The design will utilize the topographic survey that Abonmarche performed in 2023 and <br />will be supplemented with additional survey to include the asbuilt conditions of the <br />intersection of Hill Street and Madison Street and approximately 100 feet in each <br />direction. <br />2. At a minimum, the topographic survey will include the location and elevation of all <br />topographic features, including underground and overhead utilities, fences, buildings, <br />paved and gravel surfaces, driveways, toe of slope, top of bank, headwalls, sanitary and <br />storm sewer pipes and culverts including pipe sizes, inverts and direction of pipes, shrubs, <br />signs, poles, manholes, valves and meters, and all individual trees. <br />3. Existing underground utilities will be located as marked by Indiana Underground Plant <br />Protection Service and a private utility locator <br />4. Control points and references will be set in sufficient detail to construct all improvements. <br />5. A minimum of 2 benchmarks will be set and referenced <br /> <br /> <br />B. Subdivision Plat <br />1. Perform 20 year title search on subject parcel <br />2. Prepare Rule 12 Boundary Survey <br />3. Prepare (2) lot subdivision to create a new parcel for where the existing multi-use path is <br />located <br />4. Record boundary survey and subdivision plat. <br /> <br /> <br />C. Permitting <br />1. No permitting is anticipated for this project. <br /> <br /> <br />D. Utility Coordination: <br />1. Existing underground utilities have been marked by Indiana Underground Plant <br />Protection Service (IUPPS) and located in the previous topographic survey. An <br />additional utility locate ticket will be issued to supplement with any new utilities that may
The URL can be used to link to this page
Your browser does not support the video tag.