My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Text box
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
6/10/2025 11:56 AM
Text:
http://www.innergy.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Custom Millwork & Display <br />MIL <br />MILMI; Salesperson: <br />2102 W. Washington St <br />USTOM South Bend, IN 46628 Estimator: Kurt Madvig <br />MILLWORK & DISPLAY (574) 289-4000 kmadvig@builtbycmd.com <br />https://www.builtbycmd.com <br />Proposal Submitted To: <br />Larson -Danielson <br />302 Tyler St <br />La Porte, IN 46350 <br />Attention: <br />David Merkel <br />djm@ldconstruction.com <br />Phone: (219) 575-6115 <br />Fax: <br />We Hereby Submit Our Proposal For: <br />Millwork <br />Stone <br />Job Information: <br />Job Name: <br />Raclin Murphy Encore Center <br />Job Location: <br />South Bend, IN <br />Architect: <br />Bid Number: <br />0-24-1021-001 <br />Bid Date: <br />06/10/24 <br />Plan Date: <br />Spec Date: <br />Addenda: <br />Delivery Date: <br />04/18/25 <br />Clarifications and Details: <br />Change Order <br />Added casework for Equity of the Arts area and credit back for catering area <br />We Propose to Furnish the Above for the Sum of: Total Price $525.33 <br />Scope of Work: <br />Location Drawing References Products <br />102 Equity In The A-214A PL-02 Base Cabinet, PL-02 Sink Base, PL-02 Wall Cabinet, SS-01 Countertops <br />Arts <br />104 Catering Prep A-210 <br />Legal Conditions: <br />Conditions of Quote <br />PL-02 Base Cabinet, PL-02 Filler, PL-02 Sink Base, SS-01 Countertops <br />• Pricing is fixed for a period of 30 days <br />• Custom Millwork & Display, Inc. is a "Material Supplier", or "Vendor", as such, we will be issued a Purchase Order in lieu <br />of a subcontract <br />• Retainage will not be withheld from our pay applications <br />• If Textura is required for billing, then a surcharge will be added to cover all added costs <br />• Invoices are due "net 30" <br />ED IiNNERGY Page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.