My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2025
>
Change Orders
>
Change Order No. 3 - Raclin Murphy Encore Center Proj No 123-056 - Larson Danielson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 12:41:11 PM
Creation date
6/10/2025 11:55:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/10/2025
Highlight
ID:
1
Creator:
Created:
6/10/2025 11:56 AM
Modified:
7/21/2025 12:40 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KLECKNER <br />r INTERIOR <br />SYSTEMS <br />est. 1989 INC. <br />www_ decknerinteriors.com <br />Kleckner Interior Systems, Inc. <br />1176 Domon Lane <br />Chesterton, IN 46304 <br />219-787-8876 phone <br />219-787-8896fax <br />REQUEST FOR CHANGE ORDER <br />Job Name: Raclin Murphy Date: April 29th, 2025 <br />South Bend, IN <br />Descripition of work: <br />CCD #4 Updated <br />Provide labor and materials as it relates to our scope of work. Pricing includes wall type changes at RR #105, <br />#106, #110, and #111. Includes changes for wall type demarcation "C" as indicated. Includes wall type changes <br />at RR #207, #208, and #212. Includes revised ceilings as indicated. Includes revised finishes as indicated. Pricing <br />includes Ceiling Baffles as indicated in colors and with lighting as indicated. Electrical hook up by others. Total <br />of units is (77). Pricing includes framing, insulation, drywall, finishing, and ceilings as indicated. <br />CCD 4 Pricing Includes: <br />Deduct of ACP2 ceiling in Catering Prep 104 <br />Deduct of FRP from walls of Catering Prep 104 <br />Deduct of 3 5/8" metal stud wall assemblies <br />Add 3 5/8" metal stud wall assemblies <br />Add R-11 fiberglass insulation to restroom walls per wall type revisions <br />Add additional suspended drywall grid w/ drywall <br />Add additional drywall finishing at area to be exposed ceilings <br />Add additional ACP2 in Office 104 <br />Add felt baffles <br />Add additional metal stud framing and drywall at wall type revision in RR 212. (Walls now extended to deck) <br />Total <br />Total Material Deduct = <br />($2,958.00) <br />Total Labor Deduct = <br />($5,584.00) <br />Total Material Add = <br />$88,676.00 <br />Total Labor Add = <br />$26,997.00 <br />Total Equipment/Lifts = <br />$1,500.00 <br />Total Sum = <br />$108,631.00 <br />OHP = <br />$10,863.10 <br />Total = <br />$119,494.10 <br />Bonding = <br />$1,792.41 <br />Total Cost = <br />$121,286.51 <br />For accounting purposes the ceiling baffles are $82,925.00 of the costs above. <br />For accounting purposes the wall work at RR 212 carries a value of $13,230.00. <br />All other scope of work carries a value of $25,131.51 <br />Written: Kleckner Interior Systems, Inc. <br />Joshua E. Howard <br />Project Manager/Safety Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.